Chengliang Liu
- Adaptive VMD and multi-stage stabilized transformer-based long-distance forecasting for multiple shield machine tunneling parameters. In: Automation in Construction, v. 165 (September 2024). (2024):
- An adaptive operating parameters decision-making method for shield machine considering geological environment. In: Tunnelling and Underground Space Technology, v. 141 (November 2023). (2023):
- A multi-channel decoupled deep neural network for tunnel boring machine torque and thrust prediction. In: Tunnelling and Underground Space Technology, v. 133 (March 2023). (2023):
- A multi-stage data augmentation and AD-ResNet-based method for EPB utilization factor prediction. In: Automation in Construction, v. 147 (March 2023). (2023):
- Spatiotemporal Heterogeneity Analysis of Air Quality in the Yangtze River Delta, China. In: Sustainable Cities and Society, v. 78 (March 2022). (2022):
- A field parameters-based method for real-time wear estimation of disc cutter on TBM cutterhead. In: Automation in Construction, v. 124 (April 2021). (2021):
- Parametric Analysis on Hysteresis Performance and Restoring Force Model of LYP Steel Plate Shear Wall with Two-Side Connections. In: International Journal of Steel Structures, v. 20, n. 6 ( 2020). (2020):
- Parametric Analysis on Elastic Buckling Performance of Low Yield Point Steel Plate Shear Wall with Two-Side Connections. In: International Journal of Steel Structures, v. 20, n. 6 ( 2020). (2020):
- Integrating field data and 3D simulation for tower crane activity monitoring and alarming. In: Automation in Construction, v. 27 (November 2012). (2012):