Yunyue Elita Li
- Inverting continuous in-tunnel passive seismic data for velocity structure mapping ahead of the TBM cutterhead. In: Tunnelling and Underground Space Technology, v. 151 (September 2024). (2024):
- Quantifying tunneling risks ahead of TBM using Bayesian inference on continuous seismic data. In: Tunnelling and Underground Space Technology, v. 147 (May 2024). (2024):
- Large scale indoor occupant tracking using distributed acoustic sensing and machine learning. In: Building and Environment, v. 247 (January 2024). (2024):
- Real-time tunneling risk forecasting using vibrations from the working TBM. In: Tunnelling and Underground Space Technology, v. 139 (September 2023). (2023):
- Soil/rock interface profiling using a new passive seismic survey: Autocorrelation seismic interferometry. In: Tunnelling and Underground Space Technology, v. 115 (September 2021). (2021):
- Geotechnical site investigation for tunneling and underground works by advanced passive surface wave survey. In: Tunnelling and Underground Space Technology, v. 90 (August 2019). (2019):