Shufeng Li
- Crack-Detection Method for Asphalt Pavement Based on the Improved YOLOv5. In: Journal of Performance of Constructed Facilities (ASCE), v. 38, n. 2 (April 2024). (2024):
- Numerical analysis of a prefabricated concrete beam-to-column connection with bolted end plates. In: Structures, v. 59 (January 2024). (2024):
- Study on fire resistance of a prefabricated reinforced concrete frame structure. In: Journal of Structural Fire Engineering, v. 12, n. 3 (14 July 2021). (2021):
- Seismic vulnerability of prefabricated reinforced concrete frame structure based on local outsource steel tube bolted column–column connection. In: Advances in Structural Engineering, v. 24, n. 4 (February 2019). (2019):
- Study on fire resistance of prefabricated concrete beam-column joint with end-plates. In: Journal of Structural Fire Engineering, v. 11, n. 4 (August 2020). (2020):