Qianyao Li
- Identifying Falling-from-Height Hazards in Building Information Models: A Voxelization-Based Method. In: Journal of Construction Engineering and Management, v. 148, n. 2 (February 2022). (2022):
- Labor crew workspace analysis for prefabricated assemblies’ installation. A 4D-BIM-based approach. In: Engineering, Construction and Architectural Management, v. 25, n. 3 (April 2018). (2018):
- BIM Voxelization Method Supporting Cell-Based Creation of a Path-Planning Environment. In: Journal of Construction Engineering and Management, v. 146, n. 7 (July 2020). (2020):
- Engineering Harmony under Multi-Constraint Objectives: the Perspective of Meta-Analysis. In: Journal of Civil Engineering and Management, v. 0, n. 0 (22 August 2019). (2019):
- Cell-Based Transport Path Obstruction Detection Approach for 4D BIM Construction Planning. In: Journal of Construction Engineering and Management, v. 145, n. 3 (March 2019). (2019):