Miao-Kun Li
- Construction dewatering in a metro station incorporating buttress retaining wall to limit ground settlement: Insights from experimental modelling. In: Tunnelling and Underground Space Technology, v. 116 (October 2021). (2021):
- Use of cross wall to restrict enclosure movement during dewatering inside a metro pit before soil excavation. In: Tunnelling and Underground Space Technology, v. 112 (June 2021). (2021):