Lungui Li
- Development of strut-and-tie model and design guidelines for improved joint in decked bulb-tee bridge. In: Structural Engineering and Mechanics, v. 48, n. 2 (October 2013). (2013):
- (2016): Simplified full-depth precast concrete deck panel systems for accelerated bridge construction. In: Journal of Modern Transportation, v. 24, n. 4 (October 2016).
- Effect of Intermediate Diaphragms on Decked Bulb-Tee Bridge System for Accelerated Construction. In: Journal of Bridge Engineering (ASCE), v. 15, n. 6 (November 2010). (2010):
- Improved Longitudinal Joint Details in Decked Bulb Tees for Accelerated Bridge Construction: Fatigue Evaluation. In: Journal of Bridge Engineering (ASCE), v. 15, n. 5 (September 2010). (2010):
- Improved Longitudinal Joint Details in Decked Bulb Tees for Accelerated Bridge Construction: Concept Development. In: Journal of Bridge Engineering (ASCE), v. 15, n. 3 (May 2010). (2010):