Jiuhong Li
- Optimization of relief hole blasting satisfying synergistic constraints of rock-breaking area and hole-bottom minimum burden. In: Tunnelling and Underground Space Technology, v. 154 (December 2024). (2024):
- The new method of arch dam stress calculation and the application of GTSTRUDL CAE/CAD system. In: Advances in Engineering Software, v. 31, n. 4 (April 2000). (2000):