J. Lewis
- The effects of the variability of project planning on cost commitment curves: a case study. In: Engineering, Construction and Architectural Management, v. 10, n. 1 (February 2003). (2003):
- Acoustic Emissions from Construction Equipment. In: Building Acoustics, v. 7, n. 3 (September 2000). (2000):
- Sound insulation of brick diaphragm walls—I. Scale model measurement and statistical energy analysis. In: Building and Environment, v. 26, n. 2 (January 1991). (1991):
- Factors and Priorities for Assessing Sustainability of Regional Shopping Centres in the UK. In: Architectural Science Review, v. 51, n. 4 (December 2008). (2008):
- Different Stakeholder Perceptions of Sustainability Assessment. In: Architectural Science Review, v. 51, n. 1 (March 2008). (2008):
- An internet‐based decision support system for healthcare project appraisal: a conceptual proposal. In: Construction Innovation, v. 3, n. 3 (September 2003). (2003):
- Route planning, statutory procedures and Survey control. In: Proceedings of the Institution of Civil Engineers - Civil Engineering, v. 102, n. 6 (January 1994). (1994):
- To bid or not to bid: a parametric solution. In: Construction Management and Economics, v. 18, n. 4 (June 2000). (2000):