R. T. Leon
- Inelastic cyclic response of RBS connections with jumbo sections. In: Engineering Structures, v. 281 (April 2023). (2023):
- Seismic performance of riveted connections. In: Journal of Constructional Steel Research, v. 58, n. 5-8 (January 2002). (2002):
- Advanced finite element modeling of bolted T-stub connection components. In: Journal of Constructional Steel Research, v. 58, n. 5-8 (January 2002). (2002):
- Parametric analysis of steel bolted end plate connections using finite element modeling. In: Journal of Constructional Steel Research, v. 61, n. 5 (May 2005). (2005):
- Steel plate shear wall with tension-bracing for seismic rehabilitation of steel frames. In: Journal of Constructional Steel Research, v. 71 (April 2012). (2012):
- Curved steel I-girder bridges: experimental and analytical studies. In: Engineering Structures, v. 22, n. 2 (February 2000). (2000):
- Comparison of measured and predicted response of manufactured circular steel tubular members under concentric and eccentric compressive and tensile loads. In: Engineering Structures, v. 25, n. 8 (July 2003). (2003):
- Experimental and Analytical Studies of a Horizontally Curved Steel I-Girder Bridge during Erection. In: Journal of Bridge Engineering (ASCE), v. 9, n. 6 (November 2004). (2004):
- Component Modeling of Partially Restrained Composite Joints under Cyclic and Dynamic Loading. In: Journal of Structural Engineering (ASCE), v. 130, n. 2 (February 2004). (2004):
- Rapid Seismic Rehabilitation Strategy: Concept and Testing of Cable Bracing with Couples Resisting Damper. In: Journal of Structural Engineering (ASCE), v. 138, n. 3 (March 2012). (2012):
- Shakedown Tests of One-Third-Scale Composite Bridge. In: Journal of Bridge Engineering (ASCE), v. 1, n. 1 (February 1996). (1996):