W. L. Leendertse
- Travelling at 300 km/hour under the "Green Heart" of Holland — a tunnelling challenge. In: Tunnelling and Underground Space Technology, v. 14, n. 2 (April 1999). (1999):
- Measurements for Risk Control on Green Heart Tunnel. Presented at: Risk and Reliability ? Trends in Engineering, 21-23 March 2001, Malta. (2001):
- Using 3D FEM models for predicting damage during assembling of shield driven tunnel lining of the Green Heart Tunnel. Presented at: IS-Kyoto 2001, Modern Tunnelling Science & Technology, 2001, Kyoto, Japan. (2001):
- Learning experience in optimising construction quality assesment for the Green Heart Tunnel. Presented at: 28th AITES- ITA World Tunnel Congress, Sydney, 02.-08.03.2002. (2002):
- Experience with Design Build Contract of the Green Heart Tunnel. Presented at: 28th AITES- ITA World Tunnel Congress, Sydney, 02.-08.03.2002. (2002):