Chijoo Lee
- Selecting High Priority Activities For The Reallocation Of Resources To Reduce Construction Duration. In: Journal of Civil Engineering and Management, v. 28, n. 7 (22 June 2022). (2022):
- Evaluating construction delays using productivity-based resource reallocation for economic feasibility. In: Engineering, Construction and Architectural Management, v. 30, n. 4 (March 2022). (2022):
- Analysis of Construction Productivity Based on Construction Duration per Floor and per Gross Area, with Identification of Influential Factors. In: Journal of Civil Engineering and Management, v. 27, n. 3 (26 February 2021). (2021):
- Financing method for real estate and infrastructure development using Markowitz’s portfolio selection model and the Monte Carlo simulation. In: Engineering, Construction and Architectural Management, v. 26, n. 9 (September 2019). (2019):
- Prediction method of real discount rate to improve accuracy of life-cycle cost analysis. In: Energy and Buildings, v. 135 (January 2017). (2017):
- A context-awareness system that uses a thermographic camera to monitor energy waste in buildings. In: Energy and Buildings, v. 135 (January 2017). (2017):
- A Method for Analyzing the Effect of Implementing an Enterprise System Based on the Complexity of Activities. In: Journal of Civil Engineering and Management, v. 24, n. 7 (November 2018). (2018):
- Analysis of the Causes and Level of Maintenance for Enterprise Systems in Construction Companies. In: Journal of Civil Engineering and Management, v. 24, n. 6 (October 2018). (2018):
- Life-Cycle Cost Analysis on Glass Type of High-Rise Buildings for Increasing Energy Efficiency and Reducing CO2 Emissions in Korea. In: Journal of Construction Engineering and Management, v. 138, n. 7 (July 2012). (2012):
- Automated system for form layout to increase the proportion of standard forms and improve work efficiency. In: Automation in Construction, v. 87 (March 2018). (2018):
- Analysis of field applicability of the rotation-controllable tower-crane hook block. In: Automation in Construction, v. 21 (January 2012). (2012):
- Feasibility of beam erection with a motorized hook-block. In: Automation in Construction, v. 41 (May 2014). (2014):
- Method for Predicting Raw Material Prices for Product Production over Long Periods. In: Journal of Construction Engineering and Management, v. 145, n. 1 (January 2019). (2019):