V. P. Lane
- Minimum Cost Design using a Pre-Planned Nodal Search Method. In: Proceedings of the Institution of Civil Engineers, v. 59, n. 2 (June 1975). (1975):
- A Management Information System for Project Control: a Valuable Aid to Design Management. In: Proceedings of the Institution of Civil Engineers, v. 60, n. 1 (November 1976). (1976):