-
Javed, Arshad Ali / Lam, Patrick T. I. / Chan, Albert P. C. (2013): Change negotiation in public-private partnership projects through output specifications: an experimental approach based on game theory. In: Construction Management and Economics, v. 32, n. 4 (April 2013).
https://doi.org/10.1080/01446193.2014.895846
-
Chan, Albert P. C. / Lam, Patrick T. I. / Wen, Yang / Ameyaw, Ernest E. / Wang, ShouQing / Ke, Yongjian (2015): Cross-Sectional Analysis of Critical Risk Factors for PPP Water Projects in China. In: Journal of Infrastructure Systems, v. 21, n. 1 (March 2015).
https://doi.org/10.1061/(asce)is.1943-555x.0000214
-
Chan, Daniel W. M. / Lam, Patrick T. I. / Chan, Albert P. C. / Wong, James M. W. (2011): Guaranteed maximum price (GMP) contracts in practice. A case study of a private office development project in Hong Kong. In: Engineering, Construction and Architectural Management, v. 18, n. 2 (March 2011).
https://doi.org/10.1108/09699981111111157
-
Lau, Chung Him / Mesthrige, Jayantha Wadu / Lam, Patrick T. I. / Javed, Arshad Ali (2019): The challenges of adopting new engineering contract: a Hong Kong study. In: Engineering, Construction and Architectural Management, v. 26, n. 10 (October 2019).
https://doi.org/10.1108/ecam-02-2018-0055
-
Ansah, Mark Kyeredey / Chen, Xi / Yang, Hongxing / Lu, Lin / Lam, Patrick T. I. (2020): An integrated life cycle assessment of different façade systems for a typical residential building in Ghana. In: Sustainable Cities and Society, v. 53 (February 2020).
https://doi.org/10.1016/j.scs.2019.101974
-
Yang, Wenjing / Lam, Patrick T. I. (2021): Evaluating non-market costs of ICT involving data transmission in smart cities. In: Building Research & Information, v. 49, n. 7 (June 2021).
https://doi.org/10.1080/09613218.2020.1870426
-
Xu, PengPeng / Chan, Edwin H. W. / Lam, Patrick T. I. (2013): A Conceptual Framework for Delivering Sustainable Building Energy Efficency Retrofit Using the Energy Performance Contracting (EPC) in China. In: Journal of Green Building, v. 8, n. 1 (April 2013).
https://doi.org/10.3992/jgb.8.1.177
-
Wei, Yigang / Lam, Patrick T. I. (2014): Innovation Barriers at the Project Level: Study of a UK Construction Firm. In: International Journal of Architecture Engineering and Construction, v. 3, n. 3 ( 2014).
https://doi.org/10.7492/ijaec.2014.015
-
Lam, Patrick T. I. / Yu, Jack S. / Yang, H. X. (2015): Business Models for the Integrated Use of Photovoltaics in Buildings. In: International Journal of Architecture Engineering and Construction, v. 4, n. 3 (September 2015).
https://doi.org/10.7492/ijaec.2015.015
-
Lee, Pan / Lam, Patrick T. I. (2015): A Conceptual Model of Energy Performance Contracting: An Alternative Solution to Retrofit Existing Buildings. In: International Journal of Architecture Engineering and Construction, v. 4, n. 2 (June 2015).
https://doi.org/10.7492/ijaec.2015.011
-
Lam, Patrick T. I. / Fu, Franco C. S. (2019): Exploratory Study on Current Status of Startups in the Hong Kong Built Environment Sector. In: Journal of Management in Engineering (ASCE), v. 35, n. 4 (July 2019).
https://doi.org/10.1061/(asce)me.1943-5479.0000696
-
Lam, Patrick T. I. / Chiang, Y. H. / Chan, Stephen H. (2011): Critical Success Factors for Bond Financing of Construction Projects in Asia. In: Journal of Management in Engineering (ASCE), v. 27, n. 4 (October 2011).
https://doi.org/10.1061/(asce)me.1943-5479.0000063
-
Wong, Franky W. H. / Lam, Patrick T. I. (2011): Difficulties and Hindrances Facing End Users of Electronic Information Exchange Systems in Design and Construction. In: Journal of Management in Engineering (ASCE), v. 27, n. 1 (January 2011).
https://doi.org/10.1061/(asce)me.1943-5479.0000028
-
Chan, Albert P. C. / Chan, Daniel W. M. / Fan, Linda C. N. / Lam, Patrick T. I. / Yeung, John F. Y. (2008): Achieving Partnering Success through an Incentive Agreement: Lessons Learned from an Underground Railway Extension Project in Hong Kong. In: Journal of Management in Engineering (ASCE), v. 24, n. 3 (July 2008).
https://doi.org/10.1061/(asce)0742-597x(2008)24:3(128)
-
Lam, Patrick T. I. / Wong, Franky W. H. (2008): Implementing a Buildability Assessment Model for Buildability Improvement. In: Architectural Science Review, v. 51, n. 2 (June 2008).
https://doi.org/10.3763/asre.2008.5121
-
Wong, Franky W. H. / Darshi de Saram, D. / Lam, Patrick T. I. / Chan, Daniel W. M. (2006): A Compendium of Buildability Issues from the Viewpoints of Construction Practitioners. In: Architectural Science Review, v. 49, n. 1 (March 2006).
https://doi.org/10.3763/asre.2006.4910
-
Lam, Patrick T. I. / Chan, Edwin H. W. / Chau, C. K. / Poon, C. S. / Chun, K. P. (2009): Integrating Green Specifications in Construction and Overcoming Barriers in Their Use. In: Journal of Professional Issues in Engineering Education and Practice, v. 135, n. 4 (October 2009).
https://doi.org/10.1061/(asce)1052-3928(2009)135:4(142)
-
Lam, Patrick T. I. / Wong, Franky W. H. (2011): A comparative study of buildability perspectives between clients, consultants and contractors. In: Construction Innovation, v. 11, n. 3 (July 2011).
https://doi.org/10.1108/14714171111149025
-
Chiang, Yat‐Hung / Cheng, Eddie W. L. / Lam, Patrick T. I. (2010): Epistemology of capital structure decisions by building contractors in Hong Kong. In: Construction Innovation, v. 10, n. 3 (July 2010).
https://doi.org/10.1108/14714171011060105
-
Lam, Patrick T. I. / Wong, Franky W. H. / Tse, Kenny T. C. (2010): Effectiveness of ICT for Construction Information Exchange among Multidisciplinary Project Teams. In: Journal of Computing in Civil Engineering, v. 24, n. 4 (July 2010).
https://doi.org/10.1061/(asce)cp.1943-5487.0000038
-
Chan, Albert P. C. / Lam, Patrick T. I. / Chan, Daniel W. M. / Cheung, Esther / Ke, Yongjian (2010): Critical Success Factors for PPPs in Infrastructure Developments: Chinese Perspective. In: Journal of Construction Engineering and Management, v. 136, n. 5 (May 2010).
https://doi.org/10.1061/(asce)co.1943-7862.0000152
-
Chan, Daniel W. M. / Chan, Albert P. C. / Lam, Patrick T. I. / Wong, James M. W. (2010): Empirical Study of the Risks and Difficulties in Implementing Guaranteed Maximum Price and Target Cost Contracts in Construction. In: Journal of Construction Engineering and Management, v. 136, n. 5 (May 2010).
https://doi.org/10.1061/(asce)co.1943-7862.0000153
-
Chan, Albert P. C. / Lam, Patrick T. I. / Chan, Daniel W. M. / Cheung, Esther / Ke, Yongjian (2009): Drivers for Adopting Public Private Partnerships—Empirical Comparison between China and Hong Kong Special Administrative Region. In: Journal of Construction Engineering and Management, v. 135, n. 11 (November 2009).
https://doi.org/10.1061/(asce)co.1943-7862.0000088
-
Lam, Patrick T. I. / Wong, Franky W. H. (2009): Improving building project performance: how buildability benchmarking can help. In: Construction Management and Economics, v. 27, n. 1 (January 2009).
https://doi.org/10.1080/01446190802570498
-
Thomas Ng, S. / Fan, Ryan Y. C. / Wong, James M. W. / Chan, Albert P. C. / Chiang, Y. H. / Lam, Patrick T. I. / Kumaraswamy, Mohan (2009): Coping with structural change in construction: experiences gained from advanced economies. In: Construction Management and Economics, v. 27, n. 2 (February 2009).
https://doi.org/10.1080/01446190802699040
-
Chan, Albert P. C. / Yung, Esther H. K. / Lam, Patrick T. I. / Tam, C. M. / Cheung, S. O. (2001): Application of Delphi method in selection of procurement systems for construction projects. In: Construction Management and Economics, v. 19, n. 7 (November 2001).
https://doi.org/10.1080/01446190110066128
-
Wong, Franky W. H. / Lam, Patrick T. I. / Chan, Edwin H. W. / Wong, Francis K. W. (2006): Factors affecting buildability of building designs. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 33, n. 7 (July 2006).
https://doi.org/10.1139/l06-022
-
Lam, Patrick T. I. / Chan, Albert P. C. / Wong, Francis K. W. / Wong, Franky W. H. (2007): Constructability Rankings of Construction Systems Based on the Analytical Hierarchy Process. In: Journal of Architectural Engineering (ASCE), v. 13, n. 1 (March 2007).
https://doi.org/10.1061/(asce)1076-0431(2007)13:1(36)
-
Lam, Patrick T. I. / Javed, Arshad Ali (2015): Comparative Study on the Use of Output Specifications for Australian and U.K. PPP/PFI Projects. In: Journal of Performance of Constructed Facilities (ASCE), v. 29, n. 2 (April 2015).
https://doi.org/10.1061/(asce)cf.1943-5509.0000554
-
Chiang, Y. H. / Cheng, Eddie W. L. / Lam, Patrick T. I. (2010): Employing the Net Present Value-Consistent IRR Methods for PFI Contracts. In: Journal of Construction Engineering and Management, v. 136, n. 7 (July 2010).
https://doi.org/10.1061/(asce)co.1943-7862.0000179