Younghak Kwak
- Accelerated cable-stayed bridge construction using terrestrial laser scanning. In: Automation in Construction, v. 117 (September 2020). (2020):
- (2012): Wind Tunnel Tests of Vibration Control Devices for a Super Long Span Bridge. Presented at: 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012.
- (2012): Aerodynamic Characteristics of the PCT Girder Bridge under Construction by Free Cantilever Method. Presented at: 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012.
- (2016): Development of Stay Cable Measurement System using Wireless Sensors. Presented at: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016.
- Aerodynamic Characteristics of a Cable-Stayed Bridge with a Span of 1,200m. Presented at: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011. (2011):