0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Young Hoon Kwak ORCID

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Kwak, Young Hoon (2024): 2023 Journal of Management in Engineering End-of-Year Review. In: Journal of Management in Engineering (ASCE), v. 40, n. 4 (July 2024).

    https://doi.org/10.1061/jmenea.meeng-6158

  2. Choi, Jin Ouk / Kwak, Young Hoon / Chi, Seokho (2023): Key Tasks for Facility Standardization Work Process in Capital Projects. In: KSCE Journal of Civil Engineering, v. 27, n. 9 (June 2023).

    https://doi.org/10.1007/s12205-023-1350-z

  3. Ning, Yan / Kwak, Young Hoon (2022): How Do Consulting Firms with Different Project Experience Configure Dynamic Capabilities?. In: Journal of Management in Engineering (ASCE), v. 38, n. 4 (July 2022).

    https://doi.org/10.1061/(asce)me.1943-5479.0001046

  4. Seo, Wonkyoung / Kwak, Young Hoon / Kang, Youngcheol (2021): Relationship between Consistency and Performance in the Claim Management Process for Construction Projects. In: Journal of Management in Engineering (ASCE), v. 37, n. 6 (November 2021).

    https://doi.org/10.1061/(asce)me.1943-5479.0000973

  5. Choi, Kunhee / Bae, Junseo / Kwak, Young Hoon (2021): OPTID: Optimal Incentives and Disincentives. In: Journal of Management in Engineering (ASCE), v. 37, n. 5 (September 2021).

    https://doi.org/10.1061/(asce)me.1943-5479.0000946

  6. Shrestha, Binit K. / Choi, Jin Ouk / Kwak, Young Hoon / Shane, Jennifer S. (2021): Recipes for Standardized Capital Projects’ Performance Success. In: Journal of Management in Engineering (ASCE), v. 37, n. 4 (July 2021).

    https://doi.org/10.1061/(asce)me.1943-5479.0000926

  7. Choi, Jin Ouk / Shrestha, Binit Kumar / Kwak, Young Hoon / Shane, Jennifer: Exploring the benefits and trade-offs of design standardization in capital projects. In: Engineering, Construction and Architectural Management.

    https://doi.org/10.1108/ecam-08-2020-0661

  8. Suh, Min Jae / Pearce, Annie R. / Song, Yuhyun / Kwak, Young Hoon / Kim, Jung In / Zhang, Yang (2019): The Impact of Leed-energy Star Certified Office Buildings On the Market Value of Adjoining Buildings in New York City. In: Journal of Green Building, v. 14, n. 1 (January 2019).

    https://doi.org/10.3992/1943-4618.14.1.31

  9. Naderpajouh, Nader / Choi, Juyeong / Yu, David J. / Kwak, Young Hoon (2021): Management of Resilience in Civil Infrastructure Systems: An Interdisciplinary Approach. In: Journal of Management in Engineering (ASCE), v. 37, n. 1 (January 2021).

    https://doi.org/10.1061/(asce)me.1943-5479.0000871

  10. Choi, Jin Ouk / Shrestha, Binit K. / Shane, Jennifer S. / Kwak, Young Hoon (2020): Facility Design Standardization Decision-Making Model for Industrial Facilities and Capital Projects. In: Journal of Management in Engineering (ASCE), v. 36, n. 6 (November 2020).

    https://doi.org/10.1061/(asce)me.1943-5479.0000842

  11. Choi, Jin Ouk / Shrestha, Binit K. / Kwak, Young Hoon / Shane, Jennifer S. (2020): Critical Success Factors and Enablers for Facility Design Standardization of Capital Projects. In: Journal of Management in Engineering (ASCE), v. 36, n. 5 (September 2020).

    https://doi.org/10.1061/(asce)me.1943-5479.0000788

  12. Choi, Jin Ouk / Shrestha, Binit K. / Kwak, Young Hoon / Shane, Jennifer S. (2020): Innovative Technologies and Management Approaches for Facility Design Standardization and Modularization of Capital Projects. In: Journal of Management in Engineering (ASCE), v. 36, n. 5 (September 2020).

    https://doi.org/10.1061/(asce)me.1943-5479.0000805

  13. Shrestha, Binit K. / Choi, Jin Ouk / Kwak, Young Hoon / Shane, Jennifer S. (2020): How Design Standardization CSFs Can Impact Project Performance of Capital Projects. In: Journal of Management in Engineering (ASCE), v. 36, n. 4 (July 2020).

    https://doi.org/10.1061/(asce)me.1943-5479.0000792

  14. Choi, Jin Ouk / O'Connor, James T. / Kwak, Young Hoon / Shrestha, Binit K. (2019): Modularization Business Case Analysis Model for Industrial Projects. In: Journal of Management in Engineering (ASCE), v. 35, n. 3 (May 2019).

    https://doi.org/10.1061/(asce)me.1943-5479.0000683

  15. Choi, Seokjin / Cho, Insu / Han, Seung Heon / Kwak, Young Hoon / Chih, Ying-Yi (2018): Dynamic Capabilities of Project-Based Organization in Global Operations. In: Journal of Management in Engineering (ASCE), v. 34, n. 5 (September 2018).

    https://doi.org/10.1061/(asce)me.1943-5479.0000621

  16. Min, Jang Hee / Jang, Woosik / Han, Seung Heon / Kim, Doyun / Kwak, Young Hoon (2018): How Conflict Occurs and What Causes Conflict: Conflict Analysis Framework for Public Infrastructure Projects. In: Journal of Management in Engineering (ASCE), v. 34, n. 4 (July 2018).

    https://doi.org/10.1061/(asce)me.1943-5479.0000625

  17. Tran, Dai Q. / Brihac, Alex / Nguyen, Long D. / Kwak, Young Hoon (2018): Project Cost Implications of Competitive Guaranteed Maximum Price Contracts. In: Journal of Management in Engineering (ASCE), v. 34, n. 2 (March 2018).

    https://doi.org/10.1061/(asce)me.1943-5479.0000594

  18. Wang, Xiangyu / Chong, Heap-Yih / Kwak, Young Hoon (2017): Supply Chain Management in Megaprojects. In: Journal of Management in Engineering (ASCE), v. 33, n. 4 (July 2017).

    https://doi.org/10.1061/(asce)me.1943-5479.0000516

  19. Ahn, Yong Han / Kwak, Young Hoon / Suk, Sung Joon (2016): Contractors’ Transformation Strategies for Adopting Building Information Modeling. In: Journal of Management in Engineering (ASCE), v. 32, n. 1 (January 2016).

    https://doi.org/10.1061/(asce)me.1943-5479.0000390

  20. Kwak, Young Hoon / Ibbs, C. William (2002): Project Management Process Maturity (PM)2 Model. In: Journal of Management in Engineering (ASCE), v. 18, n. 3 (July 2002).

    https://doi.org/10.1061/(asce)0742-597x(2002)18:3(150)

  21. Ibbs, C. William / Wong, Clarence K. / Kwak, Young Hoon (2001): Project Change Management System. In: Journal of Management in Engineering (ASCE), v. 17, n. 3 (July 2001).

    https://doi.org/10.1061/(asce)0742-597x(2001)17:3(159)

  22. Chung, Boo Young / Skibniewski, Mirosław J. / Lucas, Henry C. / Kwak, Young Hoon (2008): Analyzing Enterprise Resource Planning System Implementation Success Factors in the Engineering–Construction Industry. In: Journal of Computing in Civil Engineering, v. 22, n. 6 (November 2008).

    https://doi.org/10.1061/(asce)0887-3801(2008)22:6(373)

  23. Ryoo, Boong Yeol / Skibniewski, Mirosław J. / Kwak, Young Hoon (2010): Web-Based Construction Project Specification System. In: Journal of Computing in Civil Engineering, v. 24, n. 2 (March 2010).

    https://doi.org/10.1061/(asce)0887-3801(2010)24:2(212)

  24. Chung, BooYoung / Skibniewski, Mirosław J. / Kwak, Young Hoon (2009): Developing ERP Systems Success Model for the Construction Industry. In: Journal of Construction Engineering and Management, v. 135, n. 3 (March 2009).

    https://doi.org/10.1061/(asce)0733-9364(2009)135:3(207)

  25. Kwak, Young Hoon (2002): Analyzing Asian Infrastructure Development Privatization Market. In: Journal of Construction Engineering and Management, v. 128, n. 2 (April 2002).

    https://doi.org/10.1061/(asce)0733-9364(2002)128:2(110)

  26. Choi, Kunhee / Kwak, Young Hoon / Pyeon, Jae-Ho / Son, Kiyoung (2012): Schedule Effectiveness of Alternative Contracting Strategies for Transportation Infrastructure Improvement Projects. In: Journal of Construction Engineering and Management, v. 138, n. 3 (March 2012).

    https://doi.org/10.1061/(asce)co.1943-7862.0000431

  27. Choi, Kunhee / Kwak, Young Hoon (2012): Decision support model for incentives/disincentives time–cost tradeoff. In: Automation in Construction, v. 21 (January 2012).

    https://doi.org/10.1016/j.autcon.2011.06.006

  28. Choi, Seokjin / Kim, Du Y. / Han, Seung H. / Kwak, Young Hoon (2014): Conceptual Cost-Prediction Model for Public Road Planning via Rough Set Theory and Case-Based Reasoning. In: Journal of Construction Engineering and Management, v. 140, n. 1 (January 2014).

    https://doi.org/10.1061/(asce)co.1943-7862.0000743

  29. Ibbs, C. William / Kwak, Young Hoon / Ng, Tzeyu / Odabasi, A. Murat (2003): Project Delivery Systems and Project Change: Quantitative Analysis. In: Journal of Construction Engineering and Management, v. 129, n. 4 (August 2003).

    https://doi.org/10.1061/(asce)0733-9364(2003)129:4(382)

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine