Matej Kušar
- Remedial measures works programme for Slovenian motorway infrastructure. In: ce/papers, v. 6, n. 5 (September 2023). (2023):
- (2019): Quality control plan for road bridges – overview of COST Action TU1406 WG3 final report. Presented at: IABSE Symposium: Towards a Resilient Built Environment Risk and Asset Management, Guimarães, Portugal, 27-29 March 2019.
- (2014): Analysis of bridge condition on state road network in Slovenia. In: Građevinar, v. 66, n. 10 ( 2014).