John Kunz
- Interdisciplinary communication medium for collaborative conceptual building design. In: Advances in Engineering Software, v. 25, n. 2-3 (March 1996). (1996):
- The Scope And Role Of Information Technology In Construction. In: 土木学会論文集 (Doboku Gakkai rombunshū), v. 2004, n. 763 (June 2004). (2004):
- Modeling Virtual Design and Construction Implementation Strategies Considering Lean Management Impacts. In: Computer-Aided Civil and Infrastructure Engineering, v. 32, n. 11 (October 2017). (2017):
- Virtual design and construction. In: Construction Management and Economics, v. 38, n. 4 (10 March 2020). (2020):
- Impact of Information Technology on Facility Engineering. In: Leadership and Management in Engineering (ASCE), v. 3, n. 2 (April 2003). (2003):
- The Circle: Architecture for Integrating Software. In: Journal of Computing in Civil Engineering, v. 9, n. 2 (April 1995). (1995):
- Semiautomated Scaffolding Planning: Development of the Feature Lexicon for Computer Application. In: Journal of Computing in Civil Engineering, v. 29, n. 5 (September 2015). (2015):
- An Ontology for Relating Features with Activities to Calculate Costs. In: Journal of Computing in Civil Engineering, v. 17, n. 4 (October 2003). (2003):
- Formalization of Construction Sequencing Rationale and Classification Mechanism to Support Rapid Generation of Sequencing Alternatives. In: Journal of Computing in Civil Engineering, v. 21, n. 6 (November 2007). (2007):
- Object-Oriented Enterprise Modeling and Simulation of AEC Projects. In: Computer-Aided Civil and Infrastructure Engineering, v. 12, n. 3 (May 1997). (1997):
- An approach for the interoperation of web-distributed applications with a design model. In: Automation in Construction, v. 8, n. 3 (February 1999). (1999):
- Virtual components consisting of form, function and behavior. In: Automation in Construction, v. 8, n. 3 (February 1999). (1999):
- Method to produce field instructions from product and process models for cast-in-place concrete operations. In: Automation in Construction, v. 22 (March 2012). (2012):
- A formal identification and re-sequencing process for developing sequencing alternatives in CPM schedules. In: Automation in Construction, v. 17, n. 1 (November 2007). (2007):
- Sharing of Temporary Structures: Formalization and Planning Application. In: Automation in Construction, v. 43 (July 2014). (2014):
- Automated Generation of Work Spaces Required by Construction Activities. In: Journal of Construction Engineering and Management, v. 128, n. 4 (August 2002). (2002):
- Representing Work Spaces Generically in Construction Method Models. In: Journal of Construction Engineering and Management, v. 128, n. 4 (August 2002). (2002):