- (2020): Schedule Delay Risk Analysis in Construction Projects with a Simulation-Based Expert System. In: Buildings, v. 10, n. 8 (23 July 2020).
- Construction Resource Allocation and Leveling Using a Threshold Accepting–Based Hyperheuristic Algorithm. In: Journal of Construction Engineering and Management, v. 138, n. 7 (July 2012). (2012):
- A simulated annealing hyperheuristic for construction resource levelling. In: Construction Management and Economics, v. 28, n. 2 (February 2010). (2010):