KyoJin Koo
- Partnering Process Model for Public-Sector Fast-Track Design-Build Projects in Korea. In: Journal of Management in Engineering (ASCE), v. 26, n. 1 (January 2010). (2010):
- Effect of Delivery Methods on Design Performance in Multifamily Housing Projects. In: Journal of Construction Engineering and Management, v. 134, n. 7 (July 2008). (2008):
- A CBR-based hybrid model for predicting a construction duration and cost based on project characteristics in multi-family housing projects. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 37, n. 5 (May 2010). (2010):