Bonsang Koo
- Automated process for generating an air conditioning duct model using the CAD-to-BIM approach. In: Journal of Building Engineering, v. 91 (August 2024). (2024):
- Which Strategies Are More Effective for International Contractors during Boom and Recession Periods?. In: Journal of Management in Engineering (ASCE), v. 28, n. 3 (July 2012). (2012):
- Formalization of Construction Sequencing Rationale and Classification Mechanism to Support Rapid Generation of Sequencing Alternatives. In: Journal of Computing in Civil Engineering, v. 21, n. 6 (November 2007). (2007):
- Integration of BIM and GIS for formal representation of walkability for safe routes to school programs. In: KSCE Journal of Civil Engineering, v. 20, n. 5 (October 2015). (2015):
- A new approach to improving the responsiveness to price fluctuations of the range estimating model through autocorrelation time-series analysis. In: KSCE Journal of Civil Engineering, v. 17, n. 2 (March 2013). (2013):
- Feasibility Study of 4D CAD in Commercial Construction. In: Journal of Construction Engineering and Management, v. 126, n. 4 (July 2000). (2000):
- An empirical study of MEP workspace modeling approaches for 4D model-based time-space conflict analyses: Case study on the international linear collider project. In: KSCE Journal of Civil Engineering, v. 17, n. 4 (December 2012). (2012):
- A multi-objective linear programming framework for evaluating the financial viability of supplementary facilities in Build-Transfer-Lease projects in Korea. In: KSCE Journal of Civil Engineering, v. 16, n. 1 (December 2011). (2011):
- A cost-plus estimating framework for BIM related design and engineering services. In: KSCE Journal of Civil Engineering, v. 21, n. 7 (May 2017). (2017):
- A constraint ontology and classification mechanism for automatic inference of the role and status of activities in CPM-based schedules. In: KSCE Journal of Civil Engineering, v. 10, n. 6 (November 2006). (2006):
- A formal identification and re-sequencing process for developing sequencing alternatives in CPM schedules. In: Automation in Construction, v. 17, n. 1 (November 2007). (2007):
- Formulation of a pull production system for optimal inventory control of temporary rebar assembly plants. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 36, n. 9 (September 2009). (2009):
- Using support vector machines to classify building elements for checking the semantic integrity of building information models. In: Automation in Construction, v. 98 (February 2019). (2019):