Jan Komanec
- (2022): New UHPFRC Bridges in Czech Republic. Presented at: IABSE Symposium: Challenges for Existing and Oncoming Structures, Prague, Czech Republic, 25-27 May 2022.
- Construction of the First Footbridge Made of UHPC in the Czech Republic. In: Advanced Materials Research, v. 1106 (June 2015). (2015):
- (2017): Cable-Stayed Footbridge with UHPC Deck in Celakovice. Presented at: Footbridge 2017 Berlin - Tell A Story, 6-8.9.2017, Technische Universität Berlin (TU Berlin).