Karla Knight
- Use of Fuzzy Logic for Predicting Design Cost Overruns on Building Projects. In: Journal of Construction Engineering and Management, v. 128, n. 6 (December 2002). (2002):
- A preliminary study of the factors affecting the cost escalation of construction projects. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 27, n. 1 (February 2000). (2000):