David King
- Investigating the Contractor’s Financial Risk under a Fixed-Price Contract during Crisis Time: The Case of the COVID-19 Pandemic. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 16, n. 3 (August 2024). (2024):
- Optimized greenery configuration to mitigate urban heat: A decade systematic review. In: Frontiers of Architectural Research, v. 11, n. 3 (June 2022). (2022):
- In Search of Adam. In: Architectural Heritage, v. 4, n. 1 (January 1993). (1993):