Yun-Seok Kim
- (2009): Stabilizing Measures of the BGFL Bridge during Construction by TMD. Presented at: IABSE Symposium: Sustainable Infrastructure - Environment Friendly, Safe and Resource Efficient, Bangkok, Thailand, 9-11 September 2009.
- (2010): TMD Method of Construction for the Cable Stayed Bridge in the Environmentally Constrained Areas. Presented at: IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010.