0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Kim, Seungho / Kim, Sangyong / Jean, Jihoon / An, Sung-Hoon (2016): DSM을 활용한 타워크레인 양중계획 최적화에 관한 연구 (Optimization of T/C Lifting Plan using Dependency Structure Matrix (DSM)). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 16, n. 2 (April 2016).

    https://doi.org/10.5345/jkibc.2016.16.2.151

  2. Jang, Young Jun / Kim, Sangyong / Shin, Yoonseok / Kim, Gwang-Hee (2014): 공공 건축물 지열에너지설비 적용에 따른 경제성 분석 (Economic Analysis of Geothermal Energy Facilities Applied to Public Buildings). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 14, n. 5 (October 2014).

    https://doi.org/10.5345/jkibc.2014.14.5.423

  3. Choi, Moonyoung / Kim, Sangyong / Kim, Seungho (2024): Semi-automated visualization method for visual inspection of buildings on BIM using 3D point cloud. In: Journal of Building Engineering, v. 81 (January 2024).

    https://doi.org/10.1016/j.jobe.2023.108017

  4. Whang, Seoung-Wook / Donyavi, Sohrab / Flanagan, Roger / Kim, Sangyong (2022): Contractor-led design risk management in international large project: Korean contractor’s perspective. In: Journal of Asian Architecture and Building Engineering, v. 22, n. 3 (July 2022).

    https://doi.org/10.1080/13467581.2022.2085718

  5. Whang, Seoung-Wook / Donyavi, Sohrab / Flanagan, Roger / Kim, Sangyong (2022): Balanced Approach For Tendering Practice At the Pre-contract Stage: the Uk Practitioner’s Perspective. In: Journal of Civil Engineering and Management, v. 28, n. 5 (3 May 2022).

    https://doi.org/10.3846/jcem.2022.16580

  6. Hyung, Won-Gil / Kim, Sangyong / Jo, Jung-Kyu (2020): Improved similarity measure in case-based reasoning: a case study of construction cost estimation. In: Engineering, Construction and Architectural Management, v. 27, n. 2 ( 2020).

    https://doi.org/10.1108/ecam-01-2019-0035

  7. Whang, Seoung-Wook / Park, Kenneth Sungho / Kim, Sangyong (2019): Critical success factors for implementing integrated construction project delivery. In: Engineering, Construction and Architectural Management, v. 26, n. 10 (October 2019).

    https://doi.org/10.1108/ecam-02-2019-0073

  8. Kim, Seungho / Whang, Seoung-Wook / Kim, Sangyong / Hyung, Won Gil (2017): Application of extended end composite pile design in pile foundation work. In: Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, v. 170, n. 5 (October 2017).

    https://doi.org/10.1680/jgeen.16.00043

  9. Whang, Seoung-Wook / Kim, Sangyong (2014): Determining sustainable design management using passive design elements for a zero emission house during the schematic design. In: Energy and Buildings, v. 77 (July 2014).

    https://doi.org/10.1016/j.enbuild.2014.03.066

  10. Whang, Seoung-Wook / Kim, Sangyong (2015): Balanced sustainable implementation in the construction industry: The perspective of Korean contractors. In: Energy and Buildings, v. 96 (June 2015).

    https://doi.org/10.1016/j.enbuild.2015.03.019

  11. Kim, Sangyong / Whang, Seoung-Wook / Kim, Gwang-Hee / Shin, Yoonseok (2015): Comparative study on the construction cost including carbon emission cost for masonry walls. In: Energy and Buildings, v. 96 (June 2015).

    https://doi.org/10.1016/j.enbuild.2015.03.025

  12. Kim, Sangyong (2013): Hybrid Forecasting System Based on Case-based Reasoning and Analytic Hierarchy Process for Cost Estimation. In: Journal of Civil Engineering and Management, v. 19, n. 1 (October 2013).

    https://doi.org/10.3846/13923730.2012.737829

  13. Kim, Sangyong (2012): Interval Estimation of Construction Cost Using Case-Based Reasoning and Genetic Algorithms. In: Journal of Asian Architecture and Building Engineering, v. 11, n. 2 (November 2012).

    https://doi.org/10.3130/jaabe.11.327

  14. Kim, Seungho / Whang, Seoung-Wook / Kim, Sangyong (2017): Pile Foundation Design Through the Increased Bearing Capacity of Extended End Pile. In: Journal of Asian Architecture and Building Engineering, v. 16, n. 2 (May 2017).

    https://doi.org/10.3130/jaabe.16.395

  15. Kim, Sangyong / Whang, Seoung-Wook / Lee, Young-Do / Shin, Yoonseok / Kim, Gwang-Hee (2017): Comparison of High-Strength Steel Pipe and H-Shaped Steel in the Strut of a Braced Wall System. In: Journal of Asian Architecture and Building Engineering, v. 16, n. 1 (January 2017).

    https://doi.org/10.3130/jaabe.16.179

  16. Shin, Dae-Woong / Kim, Sangyong / Kim, Gwang-Hee (2015): Data Fusion of Real Time Physical Status Monitoring for Building Structure through Mobile Phone. In: International Journal of Structural and Civil Engineering Research, v. 4, n. 2 ( 2015).

    https://doi.org/10.18178/ijscer.4.2.201-205

  17. Kim, Sangyong / Kim, Gwang-Hee / Lee, Dongoun (2014): Bayesian Markov Chain Monte Carlo Model for Determining Optimum Tender Price in Multifamily Housing Projects. In: Journal of Computing in Civil Engineering, v. 28, n. 3 (May 2014).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000297

  18. Kim, Jungseop / Kim, Sangyong / Tang, Llewellyn (2014): Case Study on the Determination of Building Materials Using a Support Vector Machine. In: Journal of Computing in Civil Engineering, v. 28, n. 2 (March 2014).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000259

  19. Whang, Seoung-Wook / Flanagan, Roger / Kim, Seungho / Kim, Sangyong (2017): Contractor-Led Critical Design Management Factors in High-Rise Building Projects Involving Multinational Design Teams. In: Journal of Construction Engineering and Management, v. 143, n. 5 (May 2017).

    https://doi.org/10.1061/(asce)co.1943-7862.0001242

  20. Kim, Sangyong / Shim, Jae Heon (2014): Combining case-based reasoning with genetic algorithm optimization for preliminary cost estimation in construction industry. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 41, n. 1 (January 2014).

    https://doi.org/10.1139/cjce-2013-0223

  21. Kim, Sangyong / Kim, Jin-Dong / Cho, Honggyu / Shin, Yoonseok / Kim, Gwang-Hee (2015): Finding Cultural Differences and Motivation Factors of Foreign Construction Workers. In: Journal of Building Construction and Planning Research, v. 3, n. 2 ( 2015).

    https://doi.org/10.4236/jbcpr.2015.32005

  22. Song, Hyomin / Kim, Sangyong / Shin, Yooseok / Kim, Gwang-Hee (2014): Case Study of Reactor Containment Building Construction in Nuclear Power Plant. In: Journal of Building Construction and Planning Research, v. 2, n. 3 ( 2014).

    https://doi.org/10.4236/jbcpr.2014.23016

  23. Kim, Gwang-Hee / Shin, Jae-Min / Kim, Sangyong / Shin, Yoonseok (2013): Comparison of School Building Construction Costs Estimation Methods Using Regression Analysis, Neural Network, and Support Vector Machine. In: Journal of Building Construction and Planning Research, v. 1, n. 1 ( 2013).

    https://doi.org/10.4236/jbcpr.2013.11001

  24. Kim, Seungho / Kim, Sangyong / Lee, Dongoun (2018): Sequential dependency structure matrix based framework for leveling of a tower crane lifting plan. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 45, n. 6 (June 2018).

    https://doi.org/10.1139/cjce-2017-0177

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine