-
Kang, Suhyun / Kim, Seungho / Kim, Sangyong: Automatic detection and classification process for concrete defects in deteriorating buildings based on image data. In: Journal of Asian Architecture and Building Engineering.
https://doi.org/10.1080/13467581.2024.2373832
-
Kim, Seungho / Kim, Sangyong / Jean, Jihoon / An, Sung-Hoon (2016): DSM을 활용한 타워크레인 양중계획 최적화에 관한 연구 (Optimization of T/C Lifting Plan using Dependency Structure Matrix (DSM)). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 16, n. 2 (April 2016).
https://doi.org/10.5345/jkibc.2016.16.2.151
-
Jang, Young Jun / Kim, Sangyong / Shin, Yoonseok / Kim, Gwang-Hee (2014): 공공 건축물 지열에너지설비 적용에 따른 경제성 분석 (Economic Analysis of Geothermal Energy Facilities Applied to Public Buildings). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 14, n. 5 (October 2014).
https://doi.org/10.5345/jkibc.2014.14.5.423
-
Choi, Moonyoung / Kim, Sangyong / Kim, Seungho (2024): Semi-automated visualization method for visual inspection of buildings on BIM using 3D point cloud. In: Journal of Building Engineering, v. 81 (January 2024).
https://doi.org/10.1016/j.jobe.2023.108017
-
Whang, Seoung-Wook / Donyavi, Sohrab / Flanagan, Roger / Kim, Sangyong (2022): Contractor-led design risk management in international large project: Korean contractor’s perspective. In: Journal of Asian Architecture and Building Engineering, v. 22, n. 3 (July 2022).
https://doi.org/10.1080/13467581.2022.2085718
-
Whang, Seoung-Wook / Donyavi, Sohrab / Flanagan, Roger / Kim, Sangyong (2022): Balanced Approach For Tendering Practice At the Pre-contract Stage: the Uk Practitioner’s Perspective. In: Journal of Civil Engineering and Management, v. 28, n. 5 (3 May 2022).
https://doi.org/10.3846/jcem.2022.16580
-
Hyung, Won-Gil / Kim, Sangyong / Jo, Jung-Kyu (2020): Improved similarity measure in case-based reasoning: a case study of construction cost estimation. In: Engineering, Construction and Architectural Management, v. 27, n. 2 ( 2020).
https://doi.org/10.1108/ecam-01-2019-0035
-
Whang, Seoung-Wook / Park, Kenneth Sungho / Kim, Sangyong (2019): Critical success factors for implementing integrated construction project delivery. In: Engineering, Construction and Architectural Management, v. 26, n. 10 (October 2019).
https://doi.org/10.1108/ecam-02-2019-0073
-
Kim, Seungho / Whang, Seoung-Wook / Kim, Sangyong / Hyung, Won Gil (2017): Application of extended end composite pile design in pile foundation work. In: Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, v. 170, n. 5 (October 2017).
https://doi.org/10.1680/jgeen.16.00043
-
Whang, Seoung-Wook / Kim, Sangyong (2014): Determining sustainable design management using passive design elements for a zero emission house during the schematic design. In: Energy and Buildings, v. 77 (July 2014).
https://doi.org/10.1016/j.enbuild.2014.03.066
-
Whang, Seoung-Wook / Kim, Sangyong (2015): Balanced sustainable implementation in the construction industry: The perspective of Korean contractors. In: Energy and Buildings, v. 96 (June 2015).
https://doi.org/10.1016/j.enbuild.2015.03.019
-
Kim, Sangyong / Whang, Seoung-Wook / Kim, Gwang-Hee / Shin, Yoonseok (2015): Comparative study on the construction cost including carbon emission cost for masonry walls. In: Energy and Buildings, v. 96 (June 2015).
https://doi.org/10.1016/j.enbuild.2015.03.025
-
Kim, Sangyong (2013): Hybrid Forecasting System Based on Case-based Reasoning and Analytic Hierarchy Process for Cost Estimation. In: Journal of Civil Engineering and Management, v. 19, n. 1 (October 2013).
https://doi.org/10.3846/13923730.2012.737829
-
Kim, Sangyong (2012): Interval Estimation of Construction Cost Using Case-Based Reasoning and Genetic Algorithms. In: Journal of Asian Architecture and Building Engineering, v. 11, n. 2 (November 2012).
https://doi.org/10.3130/jaabe.11.327
-
Kim, Seungho / Whang, Seoung-Wook / Kim, Sangyong (2017): Pile Foundation Design Through the Increased Bearing Capacity of Extended End Pile. In: Journal of Asian Architecture and Building Engineering, v. 16, n. 2 (May 2017).
https://doi.org/10.3130/jaabe.16.395
-
Kim, Sangyong / Whang, Seoung-Wook / Lee, Young-Do / Shin, Yoonseok / Kim, Gwang-Hee (2017): Comparison of High-Strength Steel Pipe and H-Shaped Steel in the Strut of a Braced Wall System. In: Journal of Asian Architecture and Building Engineering, v. 16, n. 1 (January 2017).
https://doi.org/10.3130/jaabe.16.179
-
Shin, Dae-Woong / Kim, Sangyong / Kim, Gwang-Hee (2015): Data Fusion of Real Time Physical Status Monitoring for Building Structure through Mobile Phone. In: International Journal of Structural and Civil Engineering Research, v. 4, n. 2 ( 2015).
https://doi.org/10.18178/ijscer.4.2.201-205
-
Kim, Sangyong / Kim, Gwang-Hee / Lee, Dongoun (2014): Bayesian Markov Chain Monte Carlo Model for Determining Optimum Tender Price in Multifamily Housing Projects. In: Journal of Computing in Civil Engineering, v. 28, n. 3 (May 2014).
https://doi.org/10.1061/(asce)cp.1943-5487.0000297
-
Kim, Jungseop / Kim, Sangyong / Tang, Llewellyn (2014): Case Study on the Determination of Building Materials Using a Support Vector Machine. In: Journal of Computing in Civil Engineering, v. 28, n. 2 (March 2014).
https://doi.org/10.1061/(asce)cp.1943-5487.0000259
-
Whang, Seoung-Wook / Flanagan, Roger / Kim, Seungho / Kim, Sangyong (2017): Contractor-Led Critical Design Management Factors in High-Rise Building Projects Involving Multinational Design Teams. In: Journal of Construction Engineering and Management, v. 143, n. 5 (May 2017).
https://doi.org/10.1061/(asce)co.1943-7862.0001242
-
Kim, Sangyong / Shim, Jae Heon (2014): Combining case-based reasoning with genetic algorithm optimization for preliminary cost estimation in construction industry. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 41, n. 1 (January 2014).
https://doi.org/10.1139/cjce-2013-0223
-
Kim, Sangyong / Kim, Jin-Dong / Cho, Honggyu / Shin, Yoonseok / Kim, Gwang-Hee (2015): Finding Cultural Differences and Motivation Factors of Foreign Construction Workers. In: Journal of Building Construction and Planning Research, v. 3, n. 2 ( 2015).
https://doi.org/10.4236/jbcpr.2015.32005
-
Song, Hyomin / Kim, Sangyong / Shin, Yooseok / Kim, Gwang-Hee (2014): Case Study of Reactor Containment Building Construction in Nuclear Power Plant. In: Journal of Building Construction and Planning Research, v. 2, n. 3 ( 2014).
https://doi.org/10.4236/jbcpr.2014.23016
-
Kim, Gwang-Hee / Shin, Jae-Min / Kim, Sangyong / Shin, Yoonseok (2013): Comparison of School Building Construction Costs Estimation Methods Using Regression Analysis, Neural Network, and Support Vector Machine. In: Journal of Building Construction and Planning Research, v. 1, n. 1 ( 2013).
https://doi.org/10.4236/jbcpr.2013.11001
-
Kim, Seungho / Kim, Sangyong / Lee, Dongoun (2018): Sequential dependency structure matrix based framework for leveling of a tower crane lifting plan. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 45, n. 6 (June 2018).
https://doi.org/10.1139/cjce-2017-0177