Jonghyeob Kim
- Identification and Reduction of Synchronous Replacements in Life-Cycle Cost Analysis of Equipment. In: Journal of Management in Engineering (ASCE), v. 35, n. 1 (January 2019). (2019):
- Model for Collecting Replacement Cycles of Building Components: Hybrid Approach of Indirect and Direct Estimations. In: Journal of Computing in Civil Engineering, v. 32, n. 6 (November 2018). (2018):
- Minimizing Fluctuation of the Maintenance, Repair, and Rehabilitation Cost Profile of a Building. In: Journal of Performance of Constructed Facilities (ASCE), v. 30, n. 3 (June 2016). (2016):