Jin-Lee Kim
- 공동주택 하자분쟁 조정제도의 활성화 방안- 기술적 쟁점사항에 대한 대응전략을 중심으로 - (Revitalization of the Conciliation System for Defect Disputes Related to Apartment Buildings - On the Technical Issue -). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 11, n. 3 (June 2011). (2011):
- Genetic algorithm stopping criteria for optimization of construction resource scheduling problems. In: Construction Management and Economics, v. 31, n. 1 (January 2013). (2013):
- Evaluating Removal Efficiency of Heavy Metals in Constructed Wetlands. In: Journal of Environmental Engineering (ASCE), v. 138, n. 4 (April 2012). (2012):
- Economic Impact of New Green Building Code On Residential Project Development From Energy Consumption Perspectives. In: Journal of Green Building, v. 9, n. 4 (November 2014). (2014):
- Use of BIM for Effective Visualization Teaching Approach in Construction Education. In: Journal of Professional Issues in Engineering Education and Practice, v. 138, n. 3 (July 2012). (2012):
- Comparing Project Performance of Design-Build and Design-Bid-Build Methods for Large-sized Public Apartment Housing Projects in Korea. In: Journal of Asian Architecture and Building Engineering, v. 14, n. 2 (May 2015). (2015):
- Cost Comparative Analysis of a New Green Building Code for Residential Project Development. In: Journal of Construction Engineering and Management, v. 140, n. 5 (May 2014). (2014):
- Permutation-Based Elitist Genetic Algorithm for Optimization of Large-Sized Resource-Constrained Project Scheduling. In: Journal of Construction Engineering and Management, v. 134, n. 11 (November 2008). (2008):
- Comparing Schedule Generation Schemes in Resource-Constrained Project Scheduling Using Elitist Genetic Algorithm. In: Journal of Construction Engineering and Management, v. 136, n. 2 (February 2010). (2010):
- Robust global and local search approach to resource-constrained project scheduling. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 36, n. 3 (March 2009). (2009):
- Improved genetic algorithm for resource-constrained scheduling of large projects. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 36, n. 6 (June 2009). (2009):