0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Mostafa Khanzadi

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Kolaei, Ali Zabihi / Hedayati, Erfan / Khanzadi, Mostafa / Amiri, Gholamreza Ghodrati (2022): Challenges and opportunities of augmented reality during the construction phase. In: Automation in Construction, v. 143 (November 2022).

    https://doi.org/10.1016/j.autcon.2022.104586

  2. Saedi, Sina / Ahmadian Fard Fini, Alireza / Khanzadi, Mostafa / Wong, Johnny / Sheikhkhoshkar, Moslem / Banaei, Maryam (2022): Applications of electroencephalography in construction. In: Automation in Construction, v. 133 (January 2022).

    https://doi.org/10.1016/j.autcon.2021.103985

  3. Dashti, Mohammad Saleh / Rezazadeh, Mohammad / Khanzadi, Mostafa / Taghaddos, Hosein (2021): Integrated BIM-based simulation for automated time-space conflict management in construction projects. In: Automation in Construction, v. 132 (December 2021).

    https://doi.org/10.1016/j.autcon.2021.103957

  4. Bayat, Morteza / Khanzadi, Mostafa / Nasirzadeh, Farnad (2019): Determining Optimal Capital Structure and Concession Period Length in BOT Scheme Using Trilateral Bargaining Game Model. In: Journal of Infrastructure Systems, v. 25, n. 1 (March 2019).

    https://doi.org/10.1061/(asce)is.1943-555x.0000456

  5. Akbari, Saeed / Khanzadi, Mostafa / Gholamian, Mohammad Reza (2018): Building a rough sets-based prediction model for classifying large-scale construction projects based on sustainable success index. In: Engineering, Construction and Architectural Management, v. 25, n. 4 (May 2018).

    https://doi.org/10.1108/ecam-05-2016-0110

  6. Fazeli, Abdulwahed / Dashti, Mohammad Saleh / Jalaei, Farzad / Khanzadi, Mostafa (2021): An integrated BIM-based approach for cost estimation in construction projects. In: Engineering, Construction and Architectural Management, v. 28, n. 9 (March 2021).

    https://doi.org/10.1108/ecam-01-2020-0027

  7. Rostamnezhad, Mozhdeh / Nasirzadeh, Farnad / Khanzadi, Mostafa / Jarban, Mohammad Jafar / Ghayoumian, Masoud (2020): Modeling social sustainability in construction projects by integrating system dynamics and fuzzy‐DEMATEL method: a case study of highway project. In: Engineering, Construction and Architectural Management, v. 27, n. 7 ( 2020).

    https://doi.org/10.1108/ecam-01-2018-0031

  8. Karji, Ali / Woldesenbet, Asregedew / Khanzadi, Mostafa / Tafazzoli, Mohammadsoroush (2019): Assessment of Social Sustainability Indicators in Mass Housing Construction: A Case Study of Mehr Housing Project. In: Sustainable Cities and Society, v. 50 (October 2019).

    https://doi.org/10.1016/j.scs.2019.101697

  9. Kaveh, Ali / Khanzadi, Mostafa / Moghaddam, Mohammad Rasteghar / Rezazadeh, Mohammad: Charged System Search and Magnetic Charged System Search Algorithms for Construction Site Layout Planning Optimization. In: Periodica Polytechnica Civil Engineering.

    https://doi.org/10.3311/ppci.11963

  10. Khanzadi, Mostafa / Kaveh, Ali / Moghaddam, Mohammad Rastegar / Pourbagheri, Seyyed Mohammad: Optimization of Building Components with Sustainability Aspects in BIM Environment. In: Periodica Polytechnica Civil Engineering.

    https://doi.org/10.3311/ppci.12551

  11. Khanzadi, Mostafa / Movahedian Attar, Amirhossein / Bagherpour, Morteza (2016): Finding Optimum Resource Allocation to Optimizing Construction Project Time/Cost through Combination of Artificial Agents CPM and GA. In: Periodica Polytechnica Civil Engineering, v. 60, n. 2 ( 2016).

    https://doi.org/10.3311/ppci.7883

  12. Kaveh, Ali / Khanzadi, Mostafa / Alipour, Majid / Naraki, Mohammad Rajabi (2015): CBO and CSS Algorithms for Resource Allocation and Time-Cost Trade-Off. In: Periodica Polytechnica Civil Engineering, v. 59, n. 3 ( 2015).

    https://doi.org/10.3311/ppci.7788

  13. Payab, Mahsa / Abbasnia, Reza / Khanzadi, Mostafa (2020): Numerical simulation of failure process of high-strength concrete using the discrete-element model. In: Proceedings of the Institution of Civil Engineers - Construction Materials, v. 173, n. 3 (June 2020).

    https://doi.org/10.1680/jcoma.16.00047

  14. Akbari, Saeed / Rahimian, Farzad Pour / Sheikhkhoshkar, Moslem / Banihashemi, Saeed / Khanzadi, Mostafa (2020): Dynamic sustainable success prediction model for infrastructure projects: a rough set based fuzzy inference system. In: Construction Innovation, v. 20, n. 4 (May 2020).

    https://doi.org/10.1108/ci-04-2019-0034

  15. Bayat, Morteza / Khanzadi, Mostafa / Nasirzadeh, Farnad (2020): Bargaining Game Model to Determine Concessionary Items in Build-Operate-Transfer Contracts. In: Journal of Construction Engineering and Management, v. 146, n. 2 (February 2020).

    https://doi.org/10.1061/(asce)co.1943-7862.0001774

  16. Khanzadi, Mostafa / Eshtehardian, Ehsan / Mokhlespour Esfahani, Mahdiyar (2017): Cash Flow Forecasting With Risk Consideration Using Bayesian Belief Networks (bbns). In: Journal of Civil Engineering and Management, v. 23, n. 8 (November 2017).

    https://doi.org/10.3846/13923730.2017.1374303

  17. Khanzadi, Mostafa / Turskis, Zenonas / Amiri, Gholamreza Ghodrati / Chalekaee, Alireza (2017): A model of discrete zero-sum two-person matrix games with grey numbers to solve dispute resolution problems in construction. In: Journal of Civil Engineering and Management, v. 23, n. 6 (June 2017).

    https://doi.org/10.3846/13923730.2017.1323005

  18. Khanzadi, Mostafa / Eshtehardian, Ehsan / Chalekaee, Alireza (2016): A Game Theory Approach for Optimum Strategy of the Owner and Contractor in Delayed Projects. In: Journal of Civil Engineering and Management, v. 22, n. 8 (November 2016).

    https://doi.org/10.3846/13923730.2016.1210222

  19. Yousefi, Vahidreza / Haji Yakhchali, Siamak / Khanzadi, Mostafa / Mehrabanfar, Ehsan / Šaparauskas, Jonas (2016): Proposing A Neural Network Model To Predict Time and Cost Claims in Construction Projects. In: Journal of Civil Engineering and Management, v. 22, n. 7 (July 2016).

    https://doi.org/10.3846/13923730.2016.1205510

  20. Khanzadi, Mostafa / Nasirzadeh, Farnad / Mir, Mostafa / Nojedehi, Pouya (2018): Prediction and improvement of labor productivity using hybrid system dynamics and agent-based modeling approach. In: Construction Innovation, v. 18, n. 1 (January 2018).

    https://doi.org/10.1108/ci-06-2015-0034

  21. Khanzadi, Mostafa / Shahbazi, Mohammad M. / Arashpour, Mehrdad / Ghosh, Somik (2019): The Less Agents, the More Schedule Reliability: Examination of Single-Point Responsibility Model in Design Management. In: International Journal of Civil Engineering, v. 17, n. 8 (March 2019).

    https://doi.org/10.1007/s40999-018-00389-9

  22. Ghandehari, Masoud / Behnood, Ali / Khanzadi, Mostafa (2010): Residual Mechanical Properties of High-Strength Concretes after Exposure to Elevated Temperatures. In: Journal of Materials in Civil Engineering (ASCE), v. 22, n. 1 (January 2010).

    https://doi.org/10.1061/(asce)0899-1561(2010)22:1(59)

  23. Dabirian, Shahin / Khanzadi, Mostafa / Taheriattar, Reza (2017): Qualitative Modeling of Sustainability Performance in Construction Projects Considering Productivity Approach. In: International Journal of Civil Engineering, v. 15, n. 8 (April 2017).

    https://doi.org/10.1007/s40999-017-0241-4

  24. Khanzadi, Mostafa / Behnood, Ali (2009): Mechanical properties of high-strength concrete incorporating copper slag as coarse aggregate. In: Construction and Building Materials, v. 23, n. 6 (June 2009).

    https://doi.org/10.1016/j.conbuildmat.2008.12.005

  25. Khanzadi, Mostafa / Nasirzadeh, Farnad / Alipour, Majid (2012): Integrating system dynamics and fuzzy logic modeling to determine concession period in BOT projects. In: Automation in Construction, v. 22 (March 2012).

    https://doi.org/10.1016/j.autcon.2011.09.015

  26. Nasirzadeh, Farnad / Afshar, Abbas / Khanzadi, Mostafa / Howick, Susan (2008): Integrating system dynamics and fuzzy logic modelling for construction risk management. In: Construction Management and Economics, v. 26, n. 11 (November 2008).

    https://doi.org/10.1080/01446190802459924

  27. Khazaeni, Garshasb / Khanzadi, Mostafa / Afshar, Abas (2012): Optimum risk allocation model for construction contracts: fuzzy TOPSIS approach. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 39, n. 7 (July 2012).

    https://doi.org/10.1139/l2012-038

  28. Nasirzadeh, Farnad / Afshar, Abbas / Khanzadi, Mostafa (2008): Dynamic risk analysis in construction projects. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 35, n. 8 (August 2008).

    https://doi.org/10.1139/l08-035

  29. Khanzadi, Mostafa / Shahbazi, Mohammad M. / Taghaddos, Hosein (2018): Forecasting schedule reliability using the reliability of agents' promises. In: Asian Journal of Civil Engineering, v. 19, n. 8 (September 2018).

    https://doi.org/10.1007/s42107-018-0075-7

  30. Khanzadi, Mostafa / Nasirzadeh, Farnad / Dashti, Mohammad Saleh (2018): Fuzzy Cognitive Map Approach to Analyze Causes of Change Orders in Construction Projects. In: Journal of Construction Engineering and Management, v. 144, n. 2 (February 2018).

    https://doi.org/10.1061/(asce)co.1943-7862.0001430

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine