- (2022): SIMURG: A new model for the integrated assessment of sustainability. In: Budownictwo i Architektura, v. 21, n. 1 (30 March 2022).
- An integrated system for duration estimation in design/build projects and organizations. In: Engineering, Construction and Architectural Management, v. 10, n. 4 (August 2003). (2003):
- Model for Managing the Contractual Risks of Construction Firms Imposed by the Procurement System. In: International Journal of Architecture Engineering and Construction. :
- Information System Analysis for a Large Construction Firm: A Case Study in Turkey. In: Architectural Science Review, v. 45, n. 4 (December 2002). (2002):
- Solution to the Problem of Inaccurate Duration-Estimation: Relational Database Model for Design/Build Organizations. In: Architectural Science Review, v. 47, n. 3 (September 2004). (2004):
- An Integrated System for Design/Build Firms to Solve Cost Estimation Problems in the Design Phase. In: Architectural Science Review, v. 46, n. 1 (March 2003). (2003):
- A computerābased information system for architectural design offices. In: Construction Innovation, v. 1, n. 1 (March 2001). (2001):