0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Kim, Chang-Won / Kim, Baek-Joong / Yoo, Wisung / Cho, Hunhee / Kang, Kyung-In (2013): Decision-making Reliability Estimation Model based on Building Construction Project Participants' Experience. In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 13, n. 2 (April 2013).

    https://doi.org/10.5345/jkibc.2013.13.2.148

  2. Kim, Baek-Joong / Yi, Chong-Ku / Kang, Kyung-In (2012): Characteristics of Alkali-activated Natural Hwangtoh Paste Utilizing Microwave Heating. In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 12, n. 5 (October 2012).

    https://doi.org/10.5345/jkibc.2012.12.5.503

  3. Kim, Minju / Kim, Taehoon / Yeo, In-Hwan / Lee, Dongmin / Cho, Hunhee / Kang, Kyung-In (2021): Improvement of Standards on Fire Safety Performance of Externally Insulated High-Rise Buildings: Focusing on the Case in Korea. In: Journal of Building Engineering, v. 35 (March 2021).

    https://doi.org/10.1016/j.jobe.2020.101990

  4. Lee, Dongmin / Kim, Taehoon / Lee, Dongyoun / Lim, Hyunsu / Cho, Hunhee / Kang, Kyung-In (2020): Development of an Advanced Composite System Form for Constructability Improvement Through a Design for Six Sigma Process. In: Journal of Civil Engineering and Management, v. 26, n. 4 (9 April 2020).

    https://doi.org/10.3846/jcem.2020.12188

  5. Kim, Dae-Won / An, Sung-Hoon / Cho, Hunhee / Jeong, Jae-Weon / Lee, Bo-Hyeong / Doh, Nakju Lett / Kang, Kyung-In (2009): Development of conceptual model of construction factory for automated construction. In: Building and Environment, v. 44, n. 8 (August 2009).

    https://doi.org/10.1016/j.buildenv.2008.10.009

  6. An, Sung-Hoon / Kim, Gwang-Hee / Kang, Kyung-In (2007): A case-based reasoning cost estimating model using experience by analytic hierarchy process. In: Building and Environment, v. 42, n. 7 (July 2007).

    https://doi.org/10.1016/j.buildenv.2006.06.007

  7. Kim, Gwang-Hee / An, Sung-Hoon / Cho, Hun-Hee / Seo, Deok-Seok / Kang, Kyung-In (2005): Improved productivity using a modified table formwork system for high-rise building in Korea. In: Building and Environment, v. 40, n. 11 (November 2005).

    https://doi.org/10.1016/j.buildenv.2004.06.023

  8. Kim, Gwang-Hee / An, Sung-Hoon / Kang, Kyung-In (2004): Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning. In: Building and Environment, v. 39, n. 10 (October 2004).

    https://doi.org/10.1016/j.buildenv.2004.02.013

  9. Kim, Chang-Jun / Yoo, Wi Sung / Lee, Ung-Kyun / Song, Ki-Jun / Kang, Kyung-In / Cho, Hunhee (2010): An experience curve-based decision support model for prioritizing restoration needs of cultural heritage. In: Journal of Cultural Heritage, v. 11, n. 4 (October 2010).

    https://doi.org/10.1016/j.culher.2010.03.004

  10. Kim, Sang-Yong / Choi, Jae-Won / Kim, Gwang-Hee / Kang, Kyung-In (2005): Comparing Cost Prediction Methods for Apartment Housing Projects: CBR versus ANN. In: Journal of Asian Architecture and Building Engineering, v. 4, n. 1 (May 2005).

    https://doi.org/10.3130/jaabe.4.113

  11. Lee, Dongyoun / Lim, Hyunsu / Lee, Dongmin / Cho, Hunhee / Kang, Kyung-In (2019): Assessment of Delay Factors for Structural Frameworks in Free-form Tall Buildings Using the FMEA. In: International Journal of Concrete Structures and Materials, v. 13, n. 1 (January 2019).

    https://doi.org/10.1186/s40069-018-0309-9

  12. An, Sung-Hoon / Park, U-Yeol / Kang, Kyung-In / Cho, Moon-young / Cho, Hun-Hee (2007): Application of Support Vector Machines in Assessing Conceptual Cost Estimates. In: Journal of Computing in Civil Engineering, v. 21, n. 4 (July 2007).

    https://doi.org/10.1061/(asce)0887-3801(2007)21:4(259)

  13. Shin, Yoonseok / Kim, Dae-Won / Kim, Jae-Yeob / Kang, Kyung-In / Cho, Moon-young / Cho, Hun-Hee (2009): Application of AdaBoost to the Retaining Wall Method Selection in Construction. In: Journal of Computing in Civil Engineering, v. 23, n. 3 (May 2009).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000001

  14. Kim, Baek-Joong / Yi, Chongku / Kang, Kyung-In (2014): Development of alkali-activated binder using hwangtoh without calcination. In: Construction and Building Materials, v. 58 (May 2014).

    https://doi.org/10.1016/j.conbuildmat.2014.02.003

  15. Kim, Dong-In / Yoo, Wi Sung / Cho, Hunhee / Kang, Kyung-In (2014): A fuzzy AHP-based decision support model for quantifying failure risk of excavation work. In: KSCE Journal of Civil Engineering, v. 18, n. 7 (July 2014).

    https://doi.org/10.1007/s12205-014-0538-7

  16. Kim, Taehoon / Lim, Hyunsu / Cho, Hunhee / Kang, Kyung-In (2014): Automated Lifting System Integrated with Construction Hoists for Table Formwork in Tall Buildings. In: Journal of Construction Engineering and Management, v. 140, n. 10 (October 2014).

    https://doi.org/10.1061/(asce)co.1943-7862.0000884

  17. Lee, Ung-Kyun / Kang, Kyung-In / Kim, Gwang-Hee / Cho, Hun-Hee (2006): Improving Tower Crane Productivity Using Wireless Technology. In: Computer-Aided Civil and Infrastructure Engineering, v. 21, n. 8 (November 2006).

    https://doi.org/10.1111/j.1467-8667.2006.00459.x

  18. Shin, Yoonseok / An, Sung-Hoon / Cho, Hun-Hee / Kim, Gwang-Hee / Kang, Kyung-In (2008): Application of information technology for mass customization in the housing construction industry in Korea. In: Automation in Construction, v. 17, n. 7 (October 2008).

    https://doi.org/10.1016/j.autcon.2008.02.010

  19. Shin, Yoonseok / Kim, Taehoon / Cho, Hunhee / Kang, Kyung-In (2012): A formwork method selection model based on boosted decision trees in tall building construction. In: Automation in Construction, v. 23 (May 2012).

    https://doi.org/10.1016/j.autcon.2011.12.007

  20. Yoo, Wi Sung / Lee, Hak-Ju / Kim, Dong-In / Kang, Kyung-In / Cho, Hunhee (2012): Genetic algorithm-based steel erection planning model for a construction automation system. In: Automation in Construction, v. 24 (July 2012).

    https://doi.org/10.1016/j.autcon.2012.02.007

  21. Lee, Ung-Kyun / Kim, Joo-Heon / Cho, Hunhee / Kang, Kyung-In (2009): Development of a mobile safety monitoring system for construction sites. In: Automation in Construction, v. 18, n. 3 (May 2009).

    https://doi.org/10.1016/j.autcon.2008.08.002

  22. Lim, Hyunsu / Kim, Taehoon / Jung, Hong-Ku / Cho, Hunhee / Kang, Kyung-In (2015): Advanced power supply of construction hoists for supertall buildings. In: Automation in Construction, v. 59 (November 2015).

    https://doi.org/10.1016/j.autcon.2015.08.002

  23. Lee, Myungdo / Kim, Taehoon / Jung, Hong-Ku / Lee, Ung-Kyun / Cho, Hunhee / Kang, Kyung-In (2014): Green construction hoist with customized energy regeneration system. In: Automation in Construction, v. 45 (September 2014).

    https://doi.org/10.1016/j.autcon.2014.05.001

  24. Kim, Taehoon / Lim, Hyunsu / Kim, Seung Woo / Cho, Hunhee / Kang, Kyung-In (2016): Inclined construction hoist for efficient resource transportation in irregularly shaped tall buildings. In: Automation in Construction, v. 62 (February 2016).

    https://doi.org/10.1016/j.autcon.2015.11.008

  25. Kim, Chang-Won / Kim, Taehoon / Lee, Ung-Kyun / Cho, Hunhee / Kang, Kyung-In (2016): Advanced Steel Beam Assembly Approach for Improving Safety of Structural Steel Workers. In: Journal of Construction Engineering and Management, v. 142, n. 4 (April 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001090

  26. Kim, Taehoon / Lim, Hyunsu / Lee, Ung-Kyun / Cha, Minsoo / Cho, Hunhee / Kang, Kyung-In (2012): Advanced formwork method integrated with a layout planning model for tall building construction. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 39, n. 11 (November 2012).

    https://doi.org/10.1139/l2012-104

  27. Seo, Jangwoo / Yoo, Wi Sung / Lee, Ung-Kyun / Kim, Chunhak / Kang, Kyung-In / Cho, Hunhee (2010): Case study of a synchronous hydraulic jack-up system for constructing high-rise residential buildings. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 37, n. 6 (June 2010).

    https://doi.org/10.1139/l10-026

  28. Choi, Yong Seok / Lim, Insig / Kim, Taehoon / Cho, Hunhee / Kang, Kyung-In (2016): Case Study of the Core Structure Succeeding Method for Tall Building Construction. In: Journal of Construction Engineering and Management, v. 142, n. 12 (December 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001197

  29. Lee, Dongmin / Lim, Hyunsu / Kim, Taehoon / Cho, Hunhee / Kang, Kyung-In (2018): Advanced planning model of formwork layout for productivity improvement in high-rise building construction. In: Automation in Construction, v. 85 (January 2018).

    https://doi.org/10.1016/j.autcon.2017.09.019

  30. Kim, Taehoon / Lee, Ung-Kyun / Kim, Seung Woo / Lim, Hyunsu / Kim, Chang-Won / Cho, Hunhee / Kang, Kyung-In (2018): Flexible double-cage hoist for high operational efficiency in tall building construction. In: Automation in Construction, v. 96 (December 2018).

    https://doi.org/10.1016/j.autcon.2018.09.023

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine