Ammar P. Kaka
- Artificial neural network cost flow risk assessment model. In: Construction Management and Economics, v. 31, n. 5 (May 2013). (2013):
- Effect of different procurement routes on contractors' cash flows. In: Engineering, Construction and Architectural Management, v. 3, n. 1 (January 1996). (1996):
- A mathematical‐based model for company‐level budgeting incorporating future unknown contracts. In: Engineering, Construction and Architectural Management, v. 16, n. 1 (January 2009). (2009):
- A survey of contractors’ corporate planning and financial budgeting. Contractors lack effective and accurate methods of corporate planning, financial budgeting and cashflow forecasting identified in survey of 15 British construction companies. In: Building Research & Information, v. 22, n. 3 ( 1994). (1994):
- As-built Documentation of Construction Sequence by Integrating Virtual Reality with Time-lapse Movies. In: Architectural Engineering and Design Management, v. 4, n. 2 (January 2008). (2008):
- Automating progress measurement of construction projects. In: Automation in Construction, v. 18, n. 3 (May 2009). (2009):
- Review of Unbalanced Bidding Models in Construction. In: Journal of Construction Engineering and Management, v. 133, n. 8 (August 2007). (2007):
- A simplified unbalanced bidding model. In: Construction Management and Economics, v. 26, n. 12 (December 2008). (2008):
- The risks of unbalanced bidding. In: Construction Management and Economics, v. 28, n. 4 (April 2010). (2010):
- Net cashflow models: Are they reliable?. In: Construction Management and Economics, v. 9, n. 3 (June 1991). (1991):
- Towards more flexible and accurate cash flow forecasting. In: Construction Management and Economics, v. 14, n. 1 (January 1996). (1996):
- Proposed Framework for Applying Cumulative Prospect Theory to an Unbalanced Bidding Model. In: Journal of Construction Engineering and Management, v. 137, n. 12 (December 2011). (2011):