Mark J. Kaiser
- Decommissioning Cost Functions in the Gulf of Mexico. In: Journal of Waterway, Port, Coastal, and Ocean Engineering, v. 129, n. 6 (November 2003). (2003):
- Cost of Site Clearance and Verification Operations in the Gulf of Mexico. In: Journal of Construction Engineering and Management, v. 131, n. 1 (January 2005). (2005):
- Cost of Abrasive Cutting in Decommissioning Operations in the Gulf of Mexico. In: Journal of Construction Engineering and Management, v. 131, n. 1 (January 2005). (2005):
- Offshore Decommissioning Cost Estimation in the Gulf of Mexico. In: Journal of Construction Engineering and Management, v. 132, n. 3 (March 2006). (2006):
- The Gulf of Mexico Decommissioning Market. In: Journal of Construction Engineering and Management, v. 132, n. 8 (August 2006). (2006):
- Decommissioning forecast in the deepwater Gulf of Mexico, 2013–2033. In: Marine Structures, v. 41 (April 2015). (2015):
- Decommissioning cost estimation in the deepwater U.S. Gulf of Mexico – Fixed platforms and compliant towers. In: Marine Structures, v. 37 (July 2014). (2014):