- (2023): Indicators for Takt Production Performance Assessment—A Conceptual Study. In: Buildings, v. 14, n. 1 (31 December 2023).
- Suggestions for takt production subcontract clauses – a conceptual study. In: Construction Innovation, v. 23, n. 2 (September 2021). (2021):
- Investigating the barriers to laser scanning implementation in building refurbishment. In: Journal of Information Technology in Construction, v. 26 (January 2021). (2021):
- (2021): Takt Production Monitoring and Control in Apartment Renovation Projects. In: Buildings, v. 11, n. 3 (27 February 2021).
- Designers’ performance evaluation in construction projects. In: Engineering, Construction and Architectural Management, v. 24, n. 1 (January 2017). (2017):
- (2020): Takt Planning in Apartment Building Renovation Projects. In: Buildings, v. 10, n. 12 (24 November 2020).
- (2020): Uncertainty in the Early Phase of a Municipal Building Refurbishment Project—A Case Study in Finland. In: Buildings, v. 10, n. 8 (23 July 2020).
- Pre-use phase LCA of a multi-story residential building: Can greenhouse gas emissions be used as a more general environmental performance indicator?. In: Building and Environment, v. 95 (January 2016). (2016):
- The promoters and the barriers for organizational culture change in a Finnish construction company. In: Construction Innovation, v. 19, n. 4 (October 2019). (2019):
- Stretching risk management standards: multi-organizational perspectives. In: Built Environment Project and Asset Management, v. 4, n. 2 (May 2014). (2014):
- Organizational Culture: Case of the Finnish Construction Industry. In: Construction Economics and Building, v. 18, n. 1 (March 2018). (2018):
- (2019): A Life Cycle Assessment of Two Residential Buildings Using Two Different LCA Database-Software Combinations: Recognizing Uniformities and Inconsistencies. In: Buildings, v. 9, n. 1 (January 2019).
- The role of multi-firm satisfaction in construction project success. In: Construction Management and Economics, v. 30, n. 6 (June 2012). (2012):