- Probabilistic Assessment of Delayed Multi-fault Rupture Effect on Maximum Tsunami Runup along the East Coast of Korea. In: KSCE Journal of Civil Engineering, v. 26, n. 1 (19 December 2021). (2021):
- Effects of submerged structure on rubble-mound breakwater: Experimental study. In: KSCE Journal of Civil Engineering, v. 11, n. 6 (November 2007). (2007):