Guangshe Jia
- Construction Duration Estimation for Airport Terminals in China: Case-Based Reasoning Model Considering Case Retrieval Methods and Case Retention Strategies. In: Journal of Construction Engineering and Management, v. 149, n. 10 (October 2023). (2023):
- (2021): Front-End Governance of a Major Public Project in Laos: A Conceptual Framework for Ensuring the Right Concept. In: Frontiers in Built Environment, v. 7 (January 2021).
- Effects of Safety Climate and Safety Behavior on Safety Outcomes between Supervisors and Construction Workers. In: Journal of Construction Engineering and Management, v. 146, n. 1 (January 2020). (2020):
- Case Study on Improving the Effectiveness of Public Participation in Public Infrastructure Megaprojects. In: Journal of Construction Engineering and Management, v. 145, n. 4 (April 2019). (2019):
- Measuring the maturity of risk management in large-scale construction projects. In: Automation in Construction, v. 34 (September 2013). (2013):