George F. Jergeas
- Contractors' ConstructionâClaims Avoidance. In: Journal of Construction Engineering and Management, v. 120, n. 3 (September 1994). (1994):
- IT usage in Alberta's building construction projects: Current status and challenges. In: Automation in Construction, v. 17, n. 8 (November 2008). (2008):
- Quantifying construction claims using the differential cost method. In: Construction Management and Economics, v. 11, n. 2 (March 1993). (1993):
- A model for proactive mediation of construction disputes. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 22, n. 1 (February 1995). (1995):
- Design Field Bending Moment Coefficients for Interior Reinforced Concrete Flat Plates. In: Practice Periodical on Structural Design and Construction, v. 16, n. 1 (February 2011). (2011):
- Why Cost and Schedule Overruns on Mega Oil Sands Projects?. In: Practice Periodical on Structural Design and Construction, v. 15, n. 1 (February 2010). (2010):