George Jergeas
- Construction Claims and Disputes: Causes and Cost/Time Overruns. In: Journal of Construction Engineering and Management, v. 120, n. 4 (December 1994). (1994):
- Benefits of Constructability on Construction Projects. In: Journal of Construction Engineering and Management, v. 127, n. 4 (August 2001). (2001):
- CTAN for Risk Assessments Using Multilevel Stochastic Networks. In: Journal of Construction Engineering and Management, v. 133, n. 1 (January 2007). (2007):
- Decision Tree Modeling Using Integrated Multilevel Stochastic Networks. In: Journal of Construction Engineering and Management, v. 132, n. 12 (December 2006). (2006):
- Factor analysis of the interface management (IM) problems for construction projects in Alberta. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 40, n. 9 (September 2013). (2013):
- Analysis of the Usage of the CII/COAA Benchmarking and Project Performance Assessment System. In: Practice Periodical on Structural Design and Construction, v. 20, n. 4 (November 2015). (2015):
- (2014): Hybrid Simulation Environment for Construction Projects: Identification of System Design Criteria. In: Journal of Construction Engineering, v. 2014 ( 2014).
- Enhancing project performance by developing multiple regression analysis and risk analysis models for interface. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 41, n. 11 (November 2014). (2014):