David Hyung Seok Jeong
- Linear Scheduling Model with Varying Production Rates. In: Journal of Construction Engineering and Management, v. 137, n. 8 (August 2011). (2011):
- Performance Assessment of On-Grade Horizontal Directional Drilling. In: Journal of Construction Engineering and Management, v. 138, n. 3 (March 2012). (2012):
- Multi-layered assessment of emerging internet based business for construction product information. In: Automation in Construction, v. 20, n. 7 (November 2011). (2011):
- Analysis of Cost-Estimating Competencies Using Criticality Matrix and Factor Analysis. In: Journal of Construction Engineering and Management, v. 138, n. 11 (November 2012). (2012):