Leroy J. Isidore
- Activity-Based Costing as a Tool for Process Improvement Evaluations. In: Journal of Management in Engineering (ASCE), v. 16, n. 2 (March 2000). (2000):
- Probabilistic Optimal-Cost Scheduling. In: Journal of Construction Engineering and Management, v. 127, n. 6 (December 2001). (2001):
- Multiple Simulation Analysis for Probabilistic Cost and Schedule Integration. In: Journal of Construction Engineering and Management, v. 128, n. 3 (June 2002). (2002):