T. Ishimura
- Evaluation of the load on shield tunnel lining in gravel. In: Tunnelling and Underground Space Technology, v. 18, n. 2-3 (April 2003). (2003):
- Development of removed pile method with cutting. In: Tunnelling and Underground Space Technology, v. 21, n. 3-4 (May 2006). (2006):