Yu‐Lin Huang
- The pricing of conditional performance guarantees with risky collateral. In: Construction Management and Economics, v. 26, n. 9 (September 2008). (2008):
- Valuation of the minimum revenue guarantee and the option to abandon in BOT infrastructure projects. In: Construction Management and Economics, v. 24, n. 4 (April 2006). (2006):
- Does debt structure matter? Estimating contractor default barrier by the down‐and‐out call option approach. In: Construction Management and Economics, v. 28, n. 9 (September 2010). (2010):
- Valuation of multi‐stage BOT projects involving dedicated asset investments: a sequential compound option approach. In: Construction Management and Economics, v. 27, n. 7 ( 2009). (2009):
- Prediction of contractor default probability using structural models of credit risk: an empirical investigation. In: Construction Management and Economics, v. 27, n. 6 (June 2009). (2009):