Yu-Lin Huang
- Compound deferrable options for the valuation of multi-stage infrastructure investment projects. In: Construction Management and Economics, v. 41, n. 8 (March 2023). (2023):
- Compound Options in Build–Operate–Transfer Projects with Default Risk for Highways in Taiwan. In: Journal of The Institution of Engineers (India): Series A, v. 100, n. 4 (April 2019). (2019):
- Real-Option Valuation of Build-Operate-Transfer Infrastructure Projects under Performance Bonding. In: Journal of Construction Engineering and Management, v. 140, n. 5 (May 2014). (2014):