Wen-Haw Huang
- Prediction of Default Probability for Construction Firms Using the Logit Model. In: Journal of Civil Engineering and Management, v. 20, n. 2 (April 2014). (2014):
- Dynamic Threshold Cash Flow–Based Structural Model for Contractor Financial Prequalification. In: Journal of Construction Engineering and Management, v. 140, n. 10 (October 2014). (2014):
- Contractor financial prequalification using simulation method based on cash flow model. In: Automation in Construction, v. 35 (November 2013). (2013):