Weijia Huang
- (2024): Technology Gap Analysis on the BIM-Enabled Design Process of Prefabricated Buildings: An Autoethnographic Study. In: Buildings, v. 14, n. 11 (22 October 2024).
- Application of the Component Method to Aluminum Alloy Gusset Joints. In: Advances in Structural Engineering, v. 18, n. 11 (November 2015). (2015):