0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Rong-Yau Huang

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Huang, Rong-Yau / Mao, I-Shiang / Lee, Hao-Kang (2010): Exploring the Deterioration Factors of RC Bridge Decks: A Rough Set Approach. Deterioration factors of RC bridge decks. In: Computer-Aided Civil and Infrastructure Engineering, v. 25, n. 7 (August 2010).

    https://doi.org/10.1111/j.1467-8667.2010.00665.x

  2. Halpin, Daniel W. / Huang, Rong-Yau (1995): Competition and Future Needs of International Clients. In: Journal of Professional Issues in Engineering Education and Practice, v. 121, n. 3 (July 1995).

    https://doi.org/10.1061/(asce)1052-3928(1995)121:3(191)

  3. Huang, Rong-Yau / Halpin, Daniel W. (1995): Graphical-Based Method for Transient Evaluation of Construction Operations. In: Journal of Construction Engineering and Management, v. 121, n. 2 (June 1995).

    https://doi.org/10.1061/(asce)0733-9364(1995)121:2(222)

  4. Huang, Rong-Yau / Sun, Kuo-Shun (2006): Non-Unit-Based Planning and Scheduling of Repetitive Construction Projects. In: Journal of Construction Engineering and Management, v. 132, n. 6 (June 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:6(585)

  5. Huang, Rong-Yau / Halpin, Daniel W. (1994): Visual Construction Operation Simulation: The DISCO Approach. In: Computer-Aided Civil and Infrastructure Engineering, v. 9, n. 3 (May 1994).

    https://doi.org/10.1111/j.1467-8667.1994.tb00371.x

  6. Huang, Rong-Yau / Sun, Kuo-Shun (2005): System development for non-unit based repetitive project scheduling. In: Automation in Construction, v. 14, n. 5 (October 2005).

    https://doi.org/10.1016/j.autcon.2005.02.003

  7. Huang, Rong-Yau / Chen, Jeam-Jei / Sun, Kuo-Shun (2004): Planning gang formwork operations for building construction using simulations. In: Automation in Construction, v. 13, n. 6 (November 2004).

    https://doi.org/10.1016/j.autcon.2004.05.001

  8. Halpin, Daniel W. / Huang, Rong-Yau (1995): A process-based approach to value-added construction — the CYCLONE/DISCO system. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 22, n. 6 (December 1995).

    https://doi.org/10.1139/l95-124

  9. Huang, Rong-Yau / Sun, Kuo-Shun (2006): An optimization model for workgroup-based repetitive scheduling. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 33, n. 9 (September 2006).

    https://doi.org/10.1139/l06-057

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine