Machine Hsie
- Optimization on Ready-Mixed Concrete Dispatching Problem via Sliding Time Window Searching. In: KSCE Journal of Civil Engineering, v. 26, n. 8 (1 July 2022). (2022):
- Attribute–Double-Sampling Method for Infrastructure Quality Assurance. In: Journal of Infrastructure Systems, v. 1, n. 2 (June 1995). (1995):
- Developing Acceptance-Sampling Methods for Quality Construction. In: Journal of Construction Engineering and Management, v. 121, n. 2 (June 1995). (1995):
- Resource-constrained scheduling for continuous repetitive projects with time-based production units. In: Automation in Construction, v. 18, n. 7 (November 2009). (2009):
- A model used in creating a work-rest schedule for laborers. In: Automation in Construction, v. 18, n. 6 (October 2009). (2009):
- Optimizing the Schedule of Dispatching Earthmoving Trucks through Genetic Algorithms and Simulation. In: Journal of Performance of Constructed Facilities (ASCE), v. 26, n. 2 (April 2012). (2012):