Gregory A. Howell
- Renovation Projects: Design Process Problems and Improvement Mechanisms. In: Journal of Management in Engineering (ASCE), v. 18, n. 4 (October 2002). (2002):
- Managing the Decision-Making Process during Project Planning. In: Journal of Management in Engineering (ASCE), v. 15, n. 2 (March 1999). (1999):
- Prebid and Preconstruction Planning Process. In: Journal of Construction Engineering and Management, v. 119, n. 3 (September 1993). (1993):
- Process of Planning during Construction. In: Journal of Construction Engineering and Management, v. 120, n. 3 (September 1994). (1994):
- Construction Engineering—Reinvigorating the Discipline. In: Journal of Construction Engineering and Management, v. 137, n. 10 (October 2011). (2011):
- Systems Model of Construction Accident Causation. In: Journal of Construction Engineering and Management, v. 131, n. 7 (July 2005). (2005):
- Work Structuring to Achieve Integrated Product–Process Design. In: Journal of Construction Engineering and Management, v. 130, n. 6 (December 2004). (2004):
- Three modes of short-term construction planning. In: Construction Management and Economics, v. 10, n. 3 (May 1992). (1992):
- New Operating System for Project Management: Consequences and Opportunities. In: Journal of Construction Engineering and Management, v. 137, n. 10 (October 2011). (2011):