R. Malcolm W. Horner
- Cost‐significant modelling ‐ its potential for use in south‐east Asia. In: Engineering, Construction and Architectural Management, v. 2, n. 2 (February 1995). (1995):
- Simple computer models of the construction process. Presented at: IABSE Workshop: Organization of the Design Process = Organisation du processus du projet = Organisation des Planungsprozesses, Zurich, Switzerland, 1986. (1986):
- Modeling Construction Labor Productivity. In: Journal of Construction Engineering and Management, v. 116, n. 4 (December 1990). (1990):
- The selection of risk management techniques using case-based reasoning. In: Civil Engineering and Environmental Systems, v. 27, n. 2 (June 2010). (2010):
- The evidence of complex variability in construction labour productivity. In: Construction Management and Economics, v. 20, n. 1 (January 2002). (2002):
- Application of the principles of ILS to the development of cost effective maintenance strategies for existing building stock. In: Construction Management and Economics, v. 21, n. 3 (April 2003). (2003):
- Creating a baseline for labour productivity of reinforced concrete building construction in Kuwait. In: Construction Management and Economics, v. 33, n. 8 (August 2014). (2014):