-
Holt, Gary D. / Olomolaiye, Paul O. / Harris, Frank C. (1996): Tendering procedures, contractual arrangements and Latham: the contractors' view. In: Engineering, Construction and Architectural Management, v. 3, n. 1 (January 1996).
https://doi.org/10.1108/eb021025
-
Wong, Chee H. / Holt, Gary D. / Harris, Phil (2001): Multi‐criteria selection or lowest price? Investigation of UK construction clients' tender evaluation preferences. In: Engineering, Construction and Architectural Management, v. 8, n. 4 (April 2001).
https://doi.org/10.1108/eb021187
-
Love, Peter E. D. / Holt, Gary D. / Li, Heng (2002): Triangulation in construction management research. In: Engineering, Construction and Architectural Management, v. 9, n. 4 (April 2002).
https://doi.org/10.1108/eb021224
-
Edwards, David J. / Holt, Gary D. (2007): Perceptions of workplace vibration hazards among a small sample of UK construction professionals. In: Engineering, Construction and Architectural Management, v. 14, n. 3 (May 2007).
https://doi.org/10.1108/09699980710744908
-
Edwards, David J. / Holt, Gary D. (2008): Health and safety issues relating to construction excavators and their attachments. In: Engineering, Construction and Architectural Management, v. 15, n. 4 (July 2008).
https://doi.org/10.1108/09699980810886838
-
Edwards, David J. / Holt, Gary D. (2009): New stability field tests for construction excavators. In: Engineering, Construction and Architectural Management, v. 16, n. 4 (July 2009).
https://doi.org/10.1108/09699980910970833
-
Holt, Gary D. / Goulding, Jack / Akintoye, Akintola (2014): Interrelationships between theory and research impact. Views from a survey of UK academics. In: Engineering, Construction and Architectural Management, v. 21, n. 6 (November 2014).
https://doi.org/10.1108/ecam-06-2013-0052
-
Holt, Gary D. (2018): Let’s change tack, not wind direction: a response to Kog and Yaman (2016). In: Engineering, Construction and Architectural Management, v. 25, n. 3 (April 2018).
https://doi.org/10.1108/ecam-02-2017-0019
-
Holt, Gary D. (2014): Infrastructure and assets: what role history?. In: Infrastructure Asset Management, v. 1, n. 1 (March 2014).
https://doi.org/10.1680/iasma.13.00006
-
Kaming, Peter F. / Olomolaiye, Paul O. / Holt, Gary D. / Harris, Frank C. (1998): What motivates construction craftsmen in developing countries? A case study of Indonesia. In: Building and Environment, v. 33, n. 2-3 (March 1998).
https://doi.org/10.1016/s0360-1323(97)00041-3
-
Holt, Gary D. / Olomolaiye, Paul O. / Harris, Frank C. (1995): A review of contractor selection practice in the U.K. construction industry. In: Building and Environment, v. 30, n. 4 (October 1995).
https://doi.org/10.1016/0360-1323(95)00008-t
-
Holt, Gary D. / Olomolaiye, Paul O. / Harris, Frank C. (1994): Factors influencing U.K. construction clients' choice of contractor. In: Building and Environment, v. 29, n. 2 (January 1994).
https://doi.org/10.1016/0360-1323(94)90074-4
-
Kaming, Peter F. / Olomolaiye, Paul O. / Holt, Gary D. / Harris, Frank C. (1997): Regional Comparison of Indonesian Construction Productivity. In: Journal of Management in Engineering (ASCE), v. 13, n. 2 (March 1997).
https://doi.org/10.1061/(asce)0742-597x(1997)13:2(33)
-
Edwards, David J. / Holt, Gary D. (2001): Predicting construction plant maintenance expenditure. In: Building Research & Information, v. 29, n. 6 ( 2001).
https://doi.org/10.1080/09613210152620813
-
Holt, Gary D. (2014): Industrial innovation: case study of the Claerwen dam. In: Built Environment Project and Asset Management, v. 4, n. 2 (May 2014).
https://doi.org/10.1108/bepam-08-2013-0032
-
Kaming, Peter F. / Olomolaiye, Paul O. / Holt, Gary D. / Kometa, Simon T. / Harris, Frank C. (1996): Project managers’ perception of production problems — An Indonesian case study. Lack of material was considered of most importance to productivity problems whilst re‐work was equally a problem under kendall concordance analysis. In: Building Research & Information, v. 24, n. 5 ( 1996).
https://doi.org/10.1080/09613219608727546
-
Holt, Gary D. / Edwards, David J. (2014): Machinery transportation management: case study of "plant-trailer" H&S incidents. In: Built Environment Project and Asset Management, v. 4, n. 3 (July 2014).
https://doi.org/10.1108/bepam-01-2014-0001
-
Edwards, David J. / Harris, Philip T. / Holt, Gary D. (1996): The greenhouse effect; Impact upon and the role to be played by construction. This paper underpins the growing concern for environmental issues and identifies the link between one such issue and the construction industry. The greenhouse effect is looked at in some detail and ways in which construction contributes to this worrying phenomenon are confirmed. In: Building Research & Information, v. 24, n. 2 ( 1996).
https://doi.org/10.1080/09613219608727508
-
Holt, Gary D. (2016): Opposing influences on construction plant and machinery health and safety innovations. In: Construction Innovation, v. 16, n. 3 (July 2016).
https://doi.org/10.1108/ci-10-2015-0048
-
Holt, Gary D. (2016): Historical British antecedents of innovative construction project organisation and social structures. In: Construction Innovation, v. 16, n. 1 (January 2016).
https://doi.org/10.1108/ci-02-2015-0010
-
Holt, Gary D. / Edwards, David J. (2012): Innovation or business survival?. A preliminary, qualitative study of UK construction plant supply chains. In: Construction Innovation, v. 12, n. 1 (January 2012).
https://doi.org/10.1108/14714171211197526
-
Edwards, David J. / Holt, Gary D. / Harris, Frank C. (2000): A model for predicting plant maintenance costs. In: Construction Management and Economics, v. 18, n. 1 (January 2000).
https://doi.org/10.1080/014461900370960
-
Wong, Chee H. / Holt, Gary D. / Cooper, Patricia A. (2000): Lowest price or value? Investigation of UK construction clients' tender selection process. In: Construction Management and Economics, v. 18, n. 7 (October 2000).
https://doi.org/10.1080/014461900433050
-
Treloar, Graham J. / Love, Peter E. D. / Holt, Gary D. (2001): Using national input/output data for embodied energy analysis of individual residential buildings. In: Construction Management and Economics, v. 19, n. 1 (January 2001).
https://doi.org/10.1080/014461901452076
-
Edwards, David J. / Holt, Gary D. / Harris, Frank C. (2002): Predicting downtime costs of tracked hydraulic excavators operating in the UK opencast mining industry. In: Construction Management and Economics, v. 20, n. 7 (October 2002).
https://doi.org/10.1080/01446190210163552
-
Edwards, David J. / Holt, Gary D. (2006): Hand‐arm vibration exposure from construction tools: results of a field study. In: Construction Management and Economics, v. 24, n. 2 (February 2006).
https://doi.org/10.1080/01446190500310643
-
Zakeri, Mahmood / Olomolaiye, Paul O. / Holt, Gary D. / Harris, Frank C. (1996): A survey of constraints on Iranian construction operatives' productivity. In: Construction Management and Economics, v. 14, n. 5 (September 1996).
https://doi.org/10.1080/014461996373287
-
Jennings, Paul / Holt, Gary D. (1998): Prequalification and multi-criteria selection: a measure of contractors' opinions. In: Construction Management and Economics, v. 16, n. 6 (November 1998).
https://doi.org/10.1080/014461998371944
-
Holt, Gary D. (2013): Unambiguous nomenclature for cyclopean British dam building history. In: Dams and Reservoirs, v. 23, n. 2 (June 2013).
https://doi.org/10.1680/dare.13.00026
-
Edwards, David J. / Holt, Gary D. (2011): Mini-Excavator Safety: Toward Innovative Stability Testing, Procurement, and Manufacture. In: Journal of Construction Engineering and Management, v. 137, n. 12 (December 2011).
https://doi.org/10.1061/(asce)co.1943-7862.0000383