Jay Holombo
- A cost effective integral bridge system with precast concrete I-girders for seismic application. In: PCI Journal, v. 60, n. 5 (September 2015). (2015):
- Continuity of Precast Prestressed Sliced-Girder Bridges Under Seismic Loads. In: PCI Journal, v. 45, n. 2 (March 2000). (2000):
- Innovative Prestressed Concrete Bridges Mark Caltrans Centennial. In: PCI Journal, v. 40, n. 6 (November 1995). (1995):